Laserfiche WebLink
From: Franzen -Hill Inc. <br />ol_.. n , <br />.r ' <br />To: 12094683433 Page: 5/6 Date: 4/18/2011 9:57:58 AM <br />0 <br />Monitoring System Certification Page 2 of 4 12/07 <br />F. In -Tank Gauging ! SIR Equipment E Check this box if tank gauging Is used only for inventory control. <br />E Check this box If no tank gauging or SIR equipment is Installed. <br />This section must be completed if in -tank gauging equipment Is used to perform leak detection monitoring. <br />r`mmntata tha fntlnaeinn chncklket- <br />E <br />Yes <br />E <br />No* <br />Has all input wiring been Inspected for proper entry and termination, including testing for ground fauits? <br />E <br />Yes <br />E <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />E <br />Yes <br />E <br />No* <br />Was accuracy of system product level readings tested? <br />E <br />Yes <br />E <br />No* <br />Was accuracy of system water level readings tested? <br />E <br />Yes <br />E. <br />No* <br />Were all probes reinstalled properly? <br />E <br />Yes <br />is <br />No* <br />I Were all items on the equipment manufacturer's maintenance checklist completed? <br />In the section t1, betow, aescriae now ana when inese aenciencies were or Witi ne correcteu. <br />G. Line Leak Detectors (LLD): E Check this box if LLDs are not installed. <br />11mmnlata tho #nlinwinn nhAckliat- <br />X Yes <br />No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all <br />NIA <br />that apply) Simulated leak rate: E 3 g.p.h.; E 0.1 g.p.h,, E 0.2 g.p.h. <br />X Yes <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />X Yes <br />No* <br />Was the testing apparatus properly calibrated? <br />X Yes <br />No* <br />For mechanical LLDs, does the LLD restrict product flow If it detects a leak? <br />NIA <br />Yes <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />X NIA <br />Yes <br />NO* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />X NIA <br />or <br />Yes <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br />X NIA <br />fails a test? <br />Yes <br />No* <br />For electronic LLDs, have all accessible wiring connections been visually Inspected? <br />X NIA <br />X Yes <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />° in the section H, beiow, describe now and when these aenctencies were or writ be correctea. <br />H. Comments. <br />Monitoring System Certification <br />Page 3 of 4 <br />12107 <br />This fax was sent with GFI FAXmaker fax server. For more information, visit: http://www.gfi.com <br />