My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 1:21:17 PM
Creation date
6/3/2020 9:50:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Secondary Containment Installation Instructions <br /> SECTION 5 <br /> Termination Terminating with the <br /> Termination Fitting <br /> A. Termination Procedure (Straight) <br /> Termination Fitting(Straight) - <br /> -The termination fitting(straight) <br /> consists of two pieces: a special Termination Coupling <br /> coupling with a ring bonded to <br /> the O.D. (the"termination cou- <br /> ecial short con- snort <br /> pIin g ) and a special Containment 0 <br /> tainment coupling(see Figs. 1 Coupling <br /> and 9). The O.D.of the ring is . <br /> the same as the scarf diameter of CTermination Coupling <br /> the secondary pipe. The primary \ Containment Pipe <br /> pipe is bonded with the special with End Scarfed =F <br /> termination coupling. After test- Make primary joints. <br /> ing,the special short contain- <br /> ment coupling is bonded (see Fig. <br /> 9). Where required,the sec- <br /> ondary containment coupling - - <br /> used in the termination fitting -- , <br /> can be supplied with a threaded Primary Pipe,Cut ' ' ' ' ' <br /> outlet. Contact your Smith and Tapered Bond on containment coupling. Figure 9 <br /> Fiberglass Products representative. <br /> SECTION 6 Maximum Allowable Air Test Pressures <br /> Testing the Containment System <br /> Pike <br /> Note: Local codes or other engineering considera- <br /> Diameter 3" 4" 6" 8" 10" 12" 14" 16" <br /> tions may dictate changes. prig 15 15 15 14 9 6 5 4 <br /> Note: Primary pipe should be tested according to the THESE PROCEDURES MUST BE FOLLOWED IN <br /> procedures in Manual No. F6000 or F6010. Testing ORDER TO AVOID SERIOUS PERSONAL INJURY <br /> of the primary piping must be completed before the OR PROPERTY DAMAGE. FAILURE TO DO SO <br /> secondary containment is bonded and tested. This WILL RESULT IN LOSS OF WARRANTY,AND <br /> is to allow inspection of the primary joints. BUYER, INSTALLER, OR ANY EMPLOYEE,AGENT, <br /> OR REPRESENTATIVE THEREOF,ASSUMES THE <br /> A. Smith Fiberglass Products recommends hydrotesting RISK OF ANY DAMAGE OR INJURY TO PERSON <br /> the secondary containment piping system with OR PROPERTY. <br /> water to 15 prig. A hydrotest is a better test for find- <br /> ing leaks in any part of the containment piping sys- Installed Smith Fiberglass Products pipe systems <br /> tem. Air tests show leakage only where a soap solu- should be tested prior to use to assure soundness <br /> tion is applied. Wear eye protection. If a hydrotest is of all joints and connections. In testing,sudden <br /> impractical,refer to paragraph B below. pressure surges must be avoided, as in some in- <br /> stances, surge or hammer can produce pressures of <br /> B. Air Test-Compressed gas (air) tests can be danger- several times the rating of the pipe and fittings. <br /> ous unless the air test pressure is low. Wear eye <br /> protection during inspection of soaped areas. The TESTING WITH AIR OR GAS CAN <br /> following low, maximum allowable test pressures AL BE EXTREMELY DANGEROUS. RE- <br /> (by diameter) make this air test a safe procedure if VIEW SAFETY PRECAUTIONS BE- <br /> normal safety precautions are followed: FORE STARTING THE TEST AND FOLLOW <br /> ALL TESTING PROCEDURES. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.