My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 1:21:17 PM
Creation date
6/3/2020 9:50:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fiber Glass Systems, 0 <br /> Bulletin B2102 <br /> May 1,2006 <br /> UUULC Listed Red Thread®II A Piping System <br /> General Specifications <br /> Primary Piping <br /> SECTION 1 :.S colve <br /> This section covers the use of fiberglass reinforced machined areas shall be protected from sunlight until <br /> plastic (FRP) pipe for single wall fuel handling and installed. <br /> fuel handling vent and vapor applications including 2.06 Acceptable Manyfacturers. Fiber Glass <br /> gasoline, unleaded gasoline, gasoline/alcohol Systems, Smith Fibercast, 501-618-2203, or approved <br /> mixtures, bio-diesel and diesel up to 150°F and 250 equal. <br /> psig cyclic pressure. <br /> Section 3-Material and Construction <br /> SECTIO 2- General Conditions 3.01 2"- " Pipe. The pipe shall be manufactured by <br /> 2.01 Coordination. Material furnished and work the filament winding process using an amine cured <br /> performed under this section shall be coordinated with epoxy thermosetting resin to impregnate strands of <br /> the related work and equipment specified under other continuous glass filaments, which are wound around <br /> sections, i.e. Valves, Flexible Connectors, Equipment. a mandrel at a 543/4" winding angle under controlled <br /> tension. The pipe shall be heat cured and the cure <br /> 2.02 Governing,Standards. Except as mofidifed or shall be confirmed using a Differential Scanning <br /> supplemented herein, all materials and construction Calorimeter. <br /> methods shall comply with and be tested in Pipe shall be supplied with a T.A.B.Tm (Threaded <br /> accordance with the following standards and test and Bonded) ends. <br /> methods: Pipe shall have a minimum continuous cyclic <br /> Standards and Test Methods pressure rating of 125 psig at 150°F in accordance <br /> UL971-2004 Standard for Nonmetallic with ASTM D2992, Procedure A or UL 971 pressure <br /> Underground Piping for Flammable rating. <br /> Liquids All pipe shall be 100% hydrotested at the factory <br /> ASTM D2310 Standard Classification for Machine- before shipment at a minimum pressure of 265 psig <br /> Made "Fiberglass" (Glass Fiber and shall be UL971-2004 Listed and labeled. <br /> Reinforced Thermosetting Resin) 3.02 ASTM D2310 Classifications (at 73.40F) <br /> Pipe 2"- 3" RTRP-11AF <br /> ASTM D2992 Standard practice for obtaining 4" RTRP-11AH <br /> Hydrostatic or Pressure Design Basis (Mechanical properties cell classifications shown are <br /> for Fiberglass" (Glass Fiber Reinf- minimums.) <br /> orced Thermosetting Resin) Pipe and <br /> Fittings 3.03 Fittings. All fittings shall be manufactured <br /> using the same type of material as the pipe. Fittings <br /> 2.03 eratin Conditions. In addition to the may be manufactured either by compression molding, <br /> above listed minimum tiondesign requirements,a clition the filament winding, resin transfer molding or contact <br /> . molding methods. All fittings, adapter, and sump <br /> system shall meet the following minimum operating penetrations shall be UL971-2004 Listed. <br /> conditions:a. Operating Pressure Fittings shall be adhesive bonded matched tapered <br /> bell and spigot. <br /> b. Fluid Conveyed 3.04 Connections. Connections to flex connectors <br /> c. Test Pressure or other piping materials shall be made by the use <br /> of NPT (National Pipe Thread) threaded adapters or <br /> 2.04 Quality Assurance. Pipe manufacturer's flanges bonded to the FRP piping system. <br /> quality program shall be in compliance with ISO 9001 3.05 Sum2 Penetrations. Sump penetrations shall <br /> and/orAPI Q1. be made by means of a permanently bonded FRP <br /> coupling. The coupling shall be capable of adjusting <br /> 2.05 DeliveM Storage. and Handling. Pipe and for the slope of the piping system entering or exiting <br /> fittings shall be protected from damage due to impact the sump wall. <br /> and point loading. Pipe shall be properly supported to 3-06 Adhesives. Adhesives shall be manufacturer's <br /> avoid damage due to flexural strain. The contractor standard for the piping system specified. <br /> shall not allow dirt, debris or other extraneous 3.07 Acceptable Products. RED THREAD IIA <br /> materials to get into pipe and fittings. All factory Piping System as manufactured by FGS Smith <br /> Fibercast or engineered approved equal. <br /> @ Trademark of Varco IIP,Inc. FIBER GLASS SYSTEMS•A NATIONAL OILWELL VARCO COMPANY <br /> http://www.smkhfibereast.com 2700 W.65th ST.,LITTLE ROCK,AR 72209.501-568-4010•FAX 501-568-4465 <br /> 25 S.MAIN ST.,SAND SPRINGS,OK 74063•918-245-6651 •FAX 918-245-7566 <br />
The URL can be used to link to this page
Your browser does not support the video tag.