Laserfiche WebLink
0 0 <br /> Piping System Information <br /> PIPE PRODUCTS FGS pipe is furnished factory packaged in compact,easy-to- <br /> handle bundles complete with protective end caps. Leave <br /> RED THREAD IIA PIPE these caps in place until installation time to protect the <br /> Epoxy pipe that is light weight and provides long service life pipe ends as well as to prevent dirt or other material <br /> and corrosion resistance. UL/ULC Listed from getting into the pipe. Fittings <br /> piping is available in 2"-4" primary pipe and adhesives should be stored in a <br /> sizes and 3",4", and 6"containment pipe ; ; cool dry area. If fittings are removed - <br /> sizes. Non UL/ULC Listed containment from the boxes, protect machined bells <br /> piping is available in 8"-16" diameters. . and spigots from exposure to direct <br /> T.A.B. (Threaded and Bonded bell and sunlight. <br /> spigot) is the primary joining method <br /> for 2"-6" pipe. Pipe comes in 15, 25, and 30 foot random Storing <br /> lengths. Bundles can be safely stored on level ground or on racks <br /> with 10 foot(3 m)or less support spacing. Avoid point loads. <br /> FITTINGS Use supports with a minimum of four-inch (100 mm) wide <br /> (UL Labels are supplied on the smallest <br /> packaging container,not the Fitting.) bearing area to prevent damage to <br /> Primary Fittings the pipe. Do not store on rocks or <br /> M11other hard objects that could cause <br /> point-loading damage. When <br /> Ilk <br /> ` outdoor storage is required, check <br /> to assure the pipes' protective end <br /> caps are in place to protect the spigots and insides of the <br /> bells from weathering. Use black polyethylene or other <br /> ultraviolet ray blocking material to cover all factory-prepared <br /> bonding surfaces if end caps are missing or not available. <br /> Transporting <br /> ME <br /> Use reasonable care in handling the pipe and fittings. When <br /> transporting from storage to the job site, do not allow pipe <br /> Clam Shell Secondary Containment Fittings to extend more than 10 feet ( 3 m) beyond the end of the <br /> truck or trailer bed; permanent damage can result from <br /> excessive bending stress. Protect pipe to prevent impact <br /> ,t and point-loading damage. NOTE: During transport,strap <br /> the pipe down with nylon or <br /> hemp rope tie downs. This <br /> will help prevent abnormal <br /> movement of the pipe <br /> during transportation. Wood Q' <br /> or padded supports are <br /> essential for truck or trailer <br /> STORAGE AND HANDLING beds that have sharp edges (such as metal plates on the <br /> Packaging, Ordering and Shipping Information back of a flat-bed trailer). When transporting the pipe on <br /> Pipe comes in 15, 25 and 30 ft. (5, 7.6 and 9.2 meter) trucks with narrow overhead piping racks (11/2" to 2740 <br /> random lengths. The number of lengths per bundle varies mm to 50 mm in width or diameter), padded supports must <br /> with the pipe diameter. Two-inch pipe is supplied with a be used to prevent point loads. If chains are used during <br /> protective mesh covering. The protective mesh covering transport,they must also be well padded to prevent damage <br /> must remain in place on primary pipe that is not to pipe walls. <br /> contained. However,the protective mesh covering may <br /> be removed when installed in containment pipe. Loading and Unloading <br /> When the pipe is not <br /> TABLE 1. Standard Packaging of Pipe specially packaged, it should <br /> Pipe Size Random Length Lengths be loaded and unloaded by <br /> Per Bundle hand. When properly palletized <br /> In. mm Ft. m or otherwise adequately <br /> 2 50 15,25,30 5,7.6,9.2 8 protected, forklifts may be 4be <br /> 3 75 15,25,30 5,7.6,9.2 6 used. Do not throw or drop <br /> 4 10015,25,30 5,7.6,9.2 4 pipe and/or fittings from the truck to the ground. Protect <br /> pipe and fittings from point-loading or impact damage at all <br /> 6 1 150 1 15,25.30 1 5,7.6,9.2 2 times. <br /> 1 <br />