My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 1:21:17 PM
Creation date
6/3/2020 9:50:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 0 <br /> Secondary Containment System Installation <br /> CONTAINMENT CROSSOVER DETAIL SUMP CONNECTIONS <br /> When installing a secondary containment system,some Entry and Termination at the Sump <br /> preparation is necessary if the closest possible separation of <br /> lines is required. To minimize the overall change in elevation • Double Wall (DW) Sump Entry/Termination Fitting <br /> when installing a clam shell containment crossover, it is with Bonded Fiberglass Alignment Rings <br /> necessary to shorten one leg of the 450 containment elbow <br /> and the side outlet run of the containment tee. NOTE: Alignment rings can be bonded to a flat fiberglass <br /> surface only. DO NOT install on round or thermoplastic <br /> Refer to Table 10 for the maximum length that can be sumps. <br /> removed and for the minimum nipple length of both product <br /> piping and secondary containment piping. 1. Determine entry hole location and cut entry hole in sump <br /> wall using dimensions in Table 12. (maximum allowable <br /> NOTE: Use self-tapping screws or match drill two holes offset is 50.) <br /> (5/16") at a distance of 3/4" (19 mm) from the cut end of the <br /> 450 elbow and the tee. Table 12. Fitting Dimensions <br /> TABLE 10. Containment Crossover Information Size A B C <br /> Containment Pipe Size (In.) (In.) (In.) (In.) <br /> Fitting 3" max.in.) 4"(max.in.) 6"(max.in.) 3x2 6.88 4.00 4.00 <br /> Remove from 1.25 2.00 1.25 4x3 6.88 4.00 5.00 <br /> 45°elbow <br /> Remove from 2. Using 40-60 grit sanding surface, sand the area around <br /> side run of tee 1.50 1.63 1.00 the hole where the alignment rings will bond to the sump. <br /> Product nipple 2x8 3x8 4x10 Lightly sand the rings. Remove dust and wipe with <br /> size(1) solvent(optional). <br /> Containment 3x6 4x6 6x8 3. Place two alignment rings on sump entry/termination <br /> nipple size fitting and insert through sump wall with the rings on the <br /> 1)Actual length of the product nipple will vary slightly because of different outside of the wall. Locate the 1/4"threaded outlet to the <br /> insertion lengths due to variations of tapers. desired location. For a gravity drain or open system, <br /> the 1/4"threaded outlet should be located at the 6 o'clock <br /> To prevent interference of the pipelines, do not locate position. Leave �/a" plastic threaded outlet protector in <br /> two containment fittings closer than shown in Table 11 and posit until ea" fitting installation. <br /> the drawing below. 4. Dry fit primary pipe and rotate the two rings until the <br /> TABLE 11. Pipe Separation Distances desired angle is reached. Make alignment marks on the <br /> rings, fitting body and the sump wall. <br /> Containment Pipe A B C D E 5. Place one ring over the sump fitting in the inside of the <br /> Inches In. In. In. In. In. sump and rotate to the desired angle. Make alignment <br /> 3 7.50 10.60 6.50 10.00 14.50 mark on both the sump wall, fitting body, and the ring. <br /> 4 8.50 12.00 7.50 12.00 16.50 6. Mix one 7014 or 8014 adhesive for each fitting per <br /> 6 10.65 15.00 8.00 14.75 22.00 the instructions in the adhesive kit. Mix in filler to thicken <br /> Containment Pipe A B C D E adhesive (fiberglass alignment ring will not seal <br /> mm mm mm mm mm mm properly without filler), <br /> 75 191 269 165 254 368 7. Apply adhesive generously, approximately 1/16"thick to <br /> 100 216 305 191 305 419 the inside and outside of the sump walls where the <br /> 150 271 381 203 375 559 alignment rings are located. Coat cut edges of the <br /> entry hole. Apply a thin coating of adhesive to the <br /> ® bonding surfaces of the alignment rings. <br /> • 8. Line fitting body and rings up with alignment marks and <br /> i e press together firmly. <br /> 9. Slide the metal retaining ring over the inside section of <br /> ® sump fitting against the alignment rings until they are <br /> 2.5 tight against sump wall. (A short section of 4"pipe maybe <br /> x NOTE:The 2.5" used to drive the metal retaining ring over the fitting.) <br /> (64mm)critical There must be an adhesive bead visible between <br /> dimension must the rings and the sump wall. The metal ring must hold <br /> c be inspected in the assembly in position while the adhesive cures. If the <br /> o the rets. Y <br /> E assembly is not tight against the sump wall,firmly press <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.