My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 1:21:17 PM
Creation date
6/3/2020 9:50:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> LIST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications.as originals will be retained by EHD) <br /> 1. Site map enclosed? YES M NO[1 <br /> 2. Submit copies of ICC Service Technician and/or Installers certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the"Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component,describe how this will be done. (if <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> (1) USA Site. (2) Sawcut. demo, remove and dispose of 41W x 8'L x 6"thick concrete <br /> pad. (3)Excavate 4'6" deep hole. (4) Expose cracked secondary piping. (5) Make <br /> repairs to fiberglass piping. Conduct air test while repaired pipe is exposed. <br /> (6)Backfill and replace concrete 6" deep with #4 rebar on 8" center each way. <br /> (7) Conduct third party testing of lines and tank, and lake testing of sump. <br /> NOTE: See attached diagram showing location of repairs. <br /> 4. List of equipment to be used(Attach manufacturers specification sheets showing third-party approval): <br /> N/A <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.