Laserfiche WebLink
Page 3 of <br /> S W RC B,1 anuary 2002 <br /> S. SECONDARY PIPE TESTING �-i professional Engineer <br /> m ❑Industry Standard <br /> Test Method Developed By: P g Manufacturer <br /> " i]Cther(Spec) ❑Hydrostatic <br /> VPressure G Vacuum <br /> Test Method Used: V� <br /> ❑ ther(Spec) <br /> Equipment Resolution: c D- S"R 5_7 <br /> Test Equipment Used: T),re s5 u✓c <br /> in # <br /> Piping Run# Piping Run#2,,. iping Run# i p g Run <br /> Piping Material: F,/u <br /> �0 <br /> vK° <br /> Piping Manufacturer: w°"F "t" -� r ► <br /> Piping Diameter: <br /> 3 " <br /> Length of Piping Run: A- - ZSd <br /> Product Stored: l e d i r.1 ►�Se <br /> Method and location of -s 44' `� - h®e <br /> i in -run isolation: f 1444A- <br /> Wait time between applying <br /> p acuum/water and <br /> startin test: <br /> Test Start Time: 5 eQ Cay wneAA Ob <br /> Initial Reading(Rj): <br /> ll L ShS� <br /> U = Ud <br /> Test End Time: I 5 <br /> Final Reading(RF): <br /> Test Duration: S <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or N 0 Los m °� P S:r <br /> Criteria: ass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Test Result: Pass ail <br /> Comments—(include information on repairs made prior to testing-, and recommended ollow-u or ailed tests) <br /> Ot-� - !7 YUA4d <br /> 94w �V� a G1�ec S e. d v <br /> U 6 <br />