Laserfiche WebLink
S W RCB,January 2002' Page 'I of <br /> 4. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> t Method Developed By: ❑Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Sped) <br /> Test Method s ' <br /> ❑Pressure ❑Vacuum ❑Hydrost � <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment R ution: <br /> Spill Box Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R'): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in R mg(RF-Rj): <br /> Pass/Fai eshold or , <br /> Criteria: <br /> Test Result: ❑ Pass ❑Fail ❑ Pass ❑ Fail ❑ Pass ❑Fait ❑ Pass ❑Fail <br /> Comments—(include informatio on repairs made prior to testin , and recommended ollow-u ailed tests) <br /> or <br />