Laserfiche WebLink
r <br /> NIFIED PROGRAM CONSOLIDATED FORM AIL <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-jPage I of 2) <br /> 490-1 <br /> TYPE OF ACTION ❑1.NEW PLAN 2.CHANGE OF INFORMATION <br /> a90-z <br /> PLAN TYPE 1.MONITORING IS IDENTICAL FOR ALL USTs AT TS FACILITY. <br /> HI <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)t- <br /> I. FACILITY INFORMATION <br /> 1 <br /> FACILITY ID#(Agency Use Only) 1 1 17- - <br /> BUSINESS NAME(Same as FACILITY NAME) 13 <br /> • <br /> A <br /> Y <br /> BUSINESS SITE ADDRESS 103. CIT104, <br /> W a e <br /> II.EQUIPMENT T STING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> !23 CCR 2632,2634,2638,2641 - <br /> MONITORING EQUIPMENT IS SERVICED X 1.ANNUALLY ❑ 99.OTHER(Specify): 490-3b <br /> III.MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. M 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)4,)o-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT ago-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY J b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM a------- <br /> --------- <br /> --5 <br /> -------------------------------------------------------------- -------------------------------------------'--------------------------------------------;-------------------490-s- <br /> PANELMANUFACTURER: 4�0 7 MODEL#: • <br /> 490.9. ! #(S).30 490.10 <br /> MODEL <br /> LEAK SENSOR MANUFACTURER: <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12 MODEL#: 490-13 <br /> -- -__ --_- ------ _-- - - - -- --_-__-- -- - -------------------------------------- --- <br /> IN-TANK PROBE MANUFACTURER: 0-90-10-. MODEL#S a-ats <br /> - - - - - - ------------------------------------------------ - - -( � ------------------ <br /> - - .WEE------------------------------ <br /> --------------------- 9C16 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-17 <br /> 490-17 <br /> ❑ <br /> d.MONTHLY - - - -e.OTHER(Specify)'- - -- - - ------- ---- -- -- - <br /> --------------------------------------- <br /> --------------- 490-18 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: r] a.36 HOURS El b.60 HOURS 490-21 <br /> 0-90-22 <br /> 49 23 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-24 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-25 <br /> 490.26 <br /> ❑ <br /> 99.OTHER (Specify): 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 49)28 <br /> VISUAL ALARMS. (23 CCR§2636) 490-29 <br /> SECONDARY CONTAINMENT IS: a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM <br /> _ --------_---------__-__-_____- -____-_________-_-___-__-__----_____-___--____________________-_.-___-_---__________-______________-_____________________. 490-31 <br /> - <br /> PANEL-MANUFACTURER: _a9)3o 1 MODEL#�� jlNLa�__--_----- <br /> _-__--_--__---__ _ -__-___-________-__-_-__-_____-_-- 490-32 + <br /> LEAK SENSOR MANUFACTURER: P - ----- '_MODEL#(S) �_"�___---_--_-. 490-33 <br /> ------------------------------------------ --------------------------- 490-34 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑a.YES b.NO <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES b.NO 490-35 <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 2636 490-36 <br /> - 490-37 MODEL#(S): 490.38 <br /> MLLD MANUFACTURER(S): <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636} 490 39 <br /> -- - - - - --- -- - - - - - -- - - - --- --- --- - -------- ------------------------------------------------------------ <br /> ELLD MANUFACTURER(S) 0-90 40. ; MODEL#(S): ---------------------------------------__ <br /> �t` 490- <br /> __-___-_ ________-________--_-_----_--_-____-_.-____-________________-________ <br /> 49042 <br /> PROGRAMMED IN LINE LEAK TEST: Elg�P-1.MINIMUM MONTHLY 0.2 h. ❑ 2-MINIMUM ANNUAL g.p.h. <br /> h. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-44 <br /> 4.PIPE INTEGRITY TESTING 49x45 <br /> TEST FREQUENCY X.a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-46490-47 <br /> ❑ 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY X a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490.49 <br /> "Allowed for mo itofing of unburied ernergency generator fuel piping only per HSC 25281.5(6)(3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)]. 490-50 <br /> ❑ T NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 49(1-51 <br /> 490.52 <br /> ❑ 99.OTHER(Specify) 0-90-53 <br /> UPCF UST-D(12/2007)1/4 <br />