My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 1:54:59 PM
Creation date
6/3/2020 9:50:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />Designated Underground Storage Tank jsqOpera <br />Monthly Visual Inspection Checklist <br />Facility Name: <br />SAN JOAQUIN GENERAL HOSPITAL <br />Date: 16i <br />Facilt Address: <br />500 WEST HOSPITAL ROAD <br />City: <br />FRENCH CAMP <br />Zip Code: CA 95231 <br />Designated UST <br />Operator Conducting the Inspection: JESSE BERUN <br />InternationalgQ <br />Council Certification 8014628-UCEx <br />iration Date: 7/25/ <br />Signature/ <br />Phone: 209 367-4800 <br />Item MONITORING PANEL / ALARM HISTORY <br />1 Monitoring system is powered on and in proper operating mode. <br />2 Monitoring system is not currently showing any alarms or warnings. <br />3 Alarm history report/log, for the previous month is available, and has been reviewed by tt <br />Designated UST Operator. Attach a cqpy o the alarm history report/loreponft to this orm i' <br />4 Each alarm for the previous month has been responded to appropriately. <br />5 Sensors located in tank -top containment sumps have not alarmed in the past month. <br />5a - List all tank -top sumps where alarms occurred in the past month: <br />Note: Sumps where an alarm has occurred in the past month must be inspected unless a quaked service techj <br />properly addressed, the cause of the alarm. Attach documentation verifying appropriate service to this report. <br />I su ins ectton is ;Sired, record results in item 6, below. <br />UST SYSTEM INSPECTION <br />6 Tank -top containment sumps are free of water, debris, and hazardous substance. Sensors are located prk.r <br />Note: Visual inspection of sums is only requi in su s where an alarm has occurred in the past month for which there is no se <br />Y N Y <br />Sump Location: TURBINE SUMP X Sump Location: <br />Sump Location: PIPING SUMP X Sump Location: <br />Sump Location: I Sump Location: <br />7 Spill containment structures are free of water, debris, and hazardous substance. <br />Y N NA 'Y <br />Tank 1— Contents: FILL BUCKET X Tank 3 — Contents: <br />Tank 2 — Contents: X Tank 4 — Contents: <br />8 Under -dispenser containment areas are free of water, debris, and hazardous substance. Sensors are located <br />Y N NA Y <br />Dispenser 1/ 2 X Dispenser 9 /10 <br />Dis enser 3 / 4 X Dispenser 11 / 12 <br />Dis enser S / 6 X Dispenser 13 / 14 <br />Dispenser 7 / 8 X Dispenser 15 / 16 <br />FACILITY EMPLOYEE TRAINING Y N NA <br />15 All facility employees have received the required on-the-'ob training within the past year. X <br />16 All facili em to ees hired within the past 30 da s have received the re u' on-the-'ob training. j X <br />Note: Any answer of "N" should be explained in the comment section on the following page, and will req Wile y <br />follow-up action. <br />Page i of 2 November 2004 <br />PAPERWORK INSPECTION <br />Y <br />N INA DATE DONE <br />9 <br />Monitoring system certification has been completed within past 12 months. <br />X <br />08/22/2014 <br />10 <br />Secondary containment tests have been completed within the required timeframe. <br />X <br />03/22/2012 <br />11 <br />Spill containment structure(bucket) testing was completed within the past year. <br />X <br />08/22/2014 <br />12 <br />Tank tightness testing was completed within required timeframe. <br />X --__--------_ <br />13 <br />Line tightness testing was completed within required timeframe. SEE COMMENTS <br />X <br />08/22/2014 <br />14 <br />Other required testis maintenance was completed within required timeframe. <br />Test. t�", . x 8�,:. a�.� , .. w.k ..,. "3122126,15 <br />X <br />03/22/2012 <br />Test/Maintenance: <br />Test/Maintenance: <br />FACILITY EMPLOYEE TRAINING Y N NA <br />15 All facility employees have received the required on-the-'ob training within the past year. X <br />16 All facili em to ees hired within the past 30 da s have received the re u' on-the-'ob training. j X <br />Note: Any answer of "N" should be explained in the comment section on the following page, and will req Wile y <br />follow-up action. <br />Page i of 2 November 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.