Laserfiche WebLink
Monitoring System Certification <br />Site Addross: <br />•• <br />UST Monitoring Site Plan <br />San Joaquin Hospital & Engineering P S .. He <br />•• <br />pilar French Camp <br />Line Continues to Boilers . . . <br />. . . . . . . ' . . OFFICE <br />..... .............. <br />X Line Test Port <br />KEY <br />A - ANNULAR <br />F — FILLS <br />T — TURBINE <br />P - PROBE <br />V— VAPOR <br />X - SUMP SENSOR <br />L—LD <br />M — Manway <br />B = Brine Sensor <br />1- Smart Sensor <br />S — STP <br />C - Floats & Chains <br />E — E Stop <br />*PIPING' <br />(arrows) <br />Drawing of piping <br />exit of sump. No <br />underground is <br />drawn, cannot <br />speculate. <br />8-25-16 <br />OPW 'Tank Gauge i ... . . ' <br />Date map was drawn: 8-25-18 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, If Installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid revel <br />probes (if used for leak detection. In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />