My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 1:54:59 PM
Creation date
6/3/2020 9:50:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
It <br />10: RED DIE Tank Sim* <br />Tank ID: Tank Size: <br />k Gauging Probe. Model: MAO <br />Model: <br />ular Space orVault Sensor. Model: 30-3221-2 <br />0 Annular Space or Vauft Sensor. Model: <br />Piping sump i Trench sensw(s), Modet 30-3221-1 11 <br />[3 Piping Sump I Trench Sensor(s)i. Model: <br />FIN Sump Swsoqs). Modet 30-3221-1 <br />RII Sump Sensor(s). Model: <br />[3 Mechanical Line Leak Detector. Model: <br />Machanical Line Leak Detector. Model: <br />0 Electronic Line Leak Detector. Modell: <br />0 Electronic Une Look Detector Model: <br />[3 Tank Overfill I High-Levell Sensor. Modet: <br />[3 Tank Overfill I H19MAvel Sensor. Model: <br />13 Ober (spe* equipmerd rype and model In Section E on Page' , <br />0 Other (specify equipment type and model in Section E on Page 2). <br />Tank 10: Tank Size: <br />Tank ID: Tank Sin: <br />0 In -Tank Gauging Probe. Model: <br />[3 In -Tank Gauging ProtmL Model: <br />Annular Spam oI Swum. Model: <br />El Annular Space orVad Sensor. Model: <br />E3 Piping Sump I Trench Sensor(o Modet <br />E3 Piping Sump if Trench Sensor(s). Model: <br />E3 FBI Sump Sensor(s). Model: <br />E3 FIN Surnio Sensor(&� Model: <br />E3 Mechanical Lin. Leak Detector. Model: <br />0 Mechanical Line Leak Detector. Model: <br />0 Electronic Line Leak Detector. Model: <br />Electrionle Una Look Detector. Model: <br />E3 Tank Overfiff. I High-Liaiiiel Sensor. Modep <br />13 Tank Overfill / Hlgh-Lwel Sansctr. Model: <br />0 Other (specify equipment type and model In Section E an Page, <br />[3 Other (specify equipment type and model In Section 9 on Pop 2). <br />ONE <br />OG -117-77" <br />SEE D0777,r =7 a <br />TA <br />0 Dispenser Containment Sensor(sj Model: <br />E3 She-VaWs� <br />
The URL can be used to link to this page
Your browser does not support the video tag.