Laserfiche WebLink
Monitoring system Certification <br />UST Monitoring Site Plan <br />Site Address: San Joaquin Hos-"-' & En ineerin Plant 500 W Hos itai French Cam <br />Date map was drawn: 8-24-12 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. on your site plan, <br />show the general layout of tanks annular spaces, sumps, dispenser npans spill containers, or otidentify thhertsecondary ions of the fcontainment areas;tmecinstalled: <br />nlical or electronic line e leak etectors;m control iand in -tank liquid level s; sensors monitoring ank <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />2/21107 <br />monitoring System Certification <br />Page 4 of 4 <br />