My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 1:54:59 PM
Creation date
6/3/2020 9:50:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Cartifiaation <br />Site Address: <br />UST Monitoring Site Plan 3 E P 0 5 2017 <br />San Joaquin Hospital 6 Engineering Pant 500 W Hospital French Camp <br />KEY <br />A - ANNULAR <br />F —FILLS <br />v.�&i.,.s. I IVI tz <br />T — TURBINE <br />P -PROBE <br />. . . . . . . . . <br />V= VAPOR <br />. . . . . . . <br />X — SUMP SENSOR <br />.......... ........ .............. <br />M-Manway <br />. . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />B = Baine Sensor <br />. . <br />. . . . . . . . . . . . . . . . . . . . . . . . _ _ - <br />I = Smart Sensor <br />........................ <br />S=STP <br />C — Floats & Chains <br />E — E Stop <br />Une Continues to Boilers . . <br />............... .. L <br />. . _ _ . . . . . . . . . . OFFICE <br />X Line Test Port <br />OPW 'Tank Gauge <br />Date map was drawn: 8-26-18 <br />*PIPING* <br />(arrows) <br />Drawing of piping <br />exit of sump. No <br />underground is <br />drawn, canmot <br />speculate. <br />8-2255-16 <br />6 <br />If you already have a diagram that shows an required Information, you may include ft, rather than this page, with your Monitoring System Certilicahen. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the folb Mng equipment, if Installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or eiechwic line leak detectors; and In -tank Squid level <br />probes (if used for leak detactiwn in the space provided, note the dam this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.