Laserfiche WebLink
Monitoring System Cartifiaation <br />Site Address: <br />UST Monitoring Site Plan 3 E P 0 5 2017 <br />San Joaquin Hospital 6 Engineering Pant 500 W Hospital French Camp <br />KEY <br />A - ANNULAR <br />F —FILLS <br />v.�&i.,.s. I IVI tz <br />T — TURBINE <br />P -PROBE <br />. . . . . . . . . <br />V= VAPOR <br />. . . . . . . <br />X — SUMP SENSOR <br />.......... ........ .............. <br />M-Manway <br />. . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />B = Baine Sensor <br />. . <br />. . . . . . . . . . . . . . . . . . . . . . . . _ _ - <br />I = Smart Sensor <br />........................ <br />S=STP <br />C — Floats & Chains <br />E — E Stop <br />Une Continues to Boilers . . <br />............... .. L <br />. . _ _ . . . . . . . . . . OFFICE <br />X Line Test Port <br />OPW 'Tank Gauge <br />Date map was drawn: 8-26-18 <br />*PIPING* <br />(arrows) <br />Drawing of piping <br />exit of sump. No <br />underground is <br />drawn, canmot <br />speculate. <br />8-2255-16 <br />6 <br />If you already have a diagram that shows an required Information, you may include ft, rather than this page, with your Monitoring System Certilicahen. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the folb Mng equipment, if Installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or eiechwic line leak detectors; and In -tank Squid level <br />probes (if used for leak detactiwn in the space provided, note the dam this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21107 <br />