Laserfiche WebLink
• r• <br />(Submit minimum of 3 sets of plans & applications as originals will be retained b�NV_ EEHD <br />lR�NMERiTAI_ HEAI.I'ti <br />Site map enclosed? YES [ ] NO [,j PERNIMSERMES <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for <br />each person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health <br />and Safety Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram <br />drawn to scale showing location of repairs and/or replacements. If repairing a component, describe how this will <br />be done. (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST <br />Installation Application pages 4-8 as necessary for a timely plan review): <br />Scope of Work: display on OPW iTouch incorrect, performed Cold Start to correct <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />N/A <br />