My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 1:54:59 PM
Creation date
6/3/2020 9:50:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Designa Underground Storage Tank (US Operator <br />Monthly Visual Inspection Checklist <br />Name: SAN JOAQUIN GENERAL HOSPITAL Date: / <br />Address: 500 WEST HOSPITAL ROAD <br />FRENCH CAMP Zip Code: CA 95231 <br />Led UST erator Conducting the Inspection: JESSE BERUMEN <br />onal Council Certification 8014628 -UC Ex iration Date: 05/24/2018 <br />e Phone: ( 209 ) 367-4800 <br />T3AIarm <br />0 MONITORING PANEL--/—AL--ARM HISTORY <br />onitorin s stem is owered on and in ro er operating mode. <br />onitorin s stem is not currentlyshowin analarms or warnings. <br />history report/log for the previous month is available, and has been reviewedby the <br />si nated UST O erat6r. (Attach a co y o the alarm history re ort/lo to thisform i ach alarm for the revious month has been res onded to aro riatel . <br />nsors located in tank -to containment sum s have not alarmed in the ast month. <br />List all tank -top sumps where alarms occurred in the past month: <br />N=No. NA= <br />Ml <br />Note: Sumps where an alarm has occurred in the past month must be inspected unless a qualified service technician responded <br />properly addressed, the cause of the alarm. Attach documentation ver fying appropriate service to this report. <br />Is= ins ection is required, record results in item 6, below. <br />6 <br />--. — — e Vi L'%l 11V1\ <br />Tank -top containment sumps are free of water, debris, and hazardous substance. Sensors are located prop( <br />Note: Visual ins ction of sums is on re wired in su1where arm hasoccurred in the ast month or which there is no sY <br />to 17 <br />Sum Location: T INE SUMP XSum <br />Location: <br />Sum Location: PIPING SUMP XSum <br />Sum Location: <br />Location:' :. <br />Sum Location: r'' <br />7 <br />Spill containment structures are free of water, debris, and hazardous substance. <br />Y N NA <br />Tank 1 — Contents: FILL BUCKET X Tank 3 — Contents: _ # <br />8 <br />Tank 2 —Contents: X Tank 4 — Contents: j <br />Under -dispenser containment areas are free of water, debris, and hazardous substance. lq <br />Y N NA <br />Dis enser 1/ 2 X Dis enser 9 / 10 <br />_Dispenser 3 / 4 X Dispenser 11 / 12 <br />Dispenser 5 / 6 X Dis enser 13114 <br />Disenser 7 / 8 X Dispenser 15 / 16 <br />MENEM <br />PAPERWORK INSPECTION 7YN j10 <br />Monitorin s stem certification has been com leted within ast 12 months. Secon containment tests have been com leted within the re aired timeframe. Sill containment structure ucket testin was com leted within the ast ear.08/2t)/..' <br />Tank ti fitnetetwaithin re wired timeframe. Line tightness testing was completed within required timeframe. SEE COMMENTS X 08/27/2015 <br />14 Other required test in maintenance was com leted within re uired timeframe. <br />Test: T `''� : Cbp�jmeQ3 4/2018 X 03/24/2015 <br />Test/Maintenance: <br />Test/Maintenance: <br />FACILITY EMPLOYEETRAINING Y N NA <br />15 All facili employees have received the required on-the-'ob trainingwithin the past year. X <br />16 All facili em to ees hired within the ast 30 days have received the re uired on-the-'ob trainin X <br />Note: Any answer of "N" should be explained in the comment section on the following page, and will require <br />follow-up action. <br />Page 1 of 2 November 2004 <br />to 17 <br />PAPERWORK INSPECTION 7YN j10 <br />Monitorin s stem certification has been com leted within ast 12 months. Secon containment tests have been com leted within the re aired timeframe. Sill containment structure ucket testin was com leted within the ast ear.08/2t)/..' <br />Tank ti fitnetetwaithin re wired timeframe. Line tightness testing was completed within required timeframe. SEE COMMENTS X 08/27/2015 <br />14 Other required test in maintenance was com leted within re uired timeframe. <br />Test: T `''� : Cbp�jmeQ3 4/2018 X 03/24/2015 <br />Test/Maintenance: <br />Test/Maintenance: <br />FACILITY EMPLOYEETRAINING Y N NA <br />15 All facili employees have received the required on-the-'ob trainingwithin the past year. X <br />16 All facili em to ees hired within the ast 30 days have received the re uired on-the-'ob trainin X <br />Note: Any answer of "N" should be explained in the comment section on the following page, and will require <br />follow-up action. <br />Page 1 of 2 November 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.