My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 1:54:59 PM
Creation date
6/3/2020 9:50:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Designate nderground Storage Tank (UST erator <br />Monthly Visual Inspection Checklist , <br />SAN JOAQUIN GENERAL HOSPITAL Date: <br />Facili Name: <br />Facili Address: 500 WEST HOSPITAL ROAD Zi Code: CA 95231 <br />Ci FRENCH CAMP <br />Desi ated UST Operator Conductin the Ins ection: JESSE ----TBERUNiration Date: 06/06/2016 <br />Internationa o e Council fication 8014628 -UC phone: ( 209 ) 367-4800 <br />Si ature- Y = Yes, N <br />MONITORING PANEL /ALARM HISTORY <br />Item a <br />1 Monitoringsystem is powered on and in ISM <br />roper operating mode. <br />2 Monitoring system is not currently Showing any alarms or warnin s. <br />has beenreviewed by <br />3 Alarm history report/log for the previous moonth is the alarm htstoanre ordloto this orm i�availa <br />Desi ated UST eratdr. Atta <br />month has been responded to a ro riatel . <br />4 Each alarm for the revious <br />sum shave not alarmed in the ast month. <br />5 Sensors located in tank -to containment <br />— <br />Sa - List all tank -top sumps where alarms occurred in the past month:tec <br />Note: Sumps where an alarm has occurred in the past month must be inspected unless a qualified service to this report. <br />Attach documentation verging appropriate service <br />properly addressed the cause of the alarm. <br />fired, record results in item 6, below. <br />1 s i ectian is re <br />UST SYSTEM INSPECTION <br />6 Tank -top containment sumps are free of water, debris, and hazardous substance. Sensors <br />an alarm has occurred in the ast month or <br />Note: Visual inspection o sums is onLy re uired Ysum Nwhere <br />Sum Location: INE SUMP X <br />Sum Location: <br />Sum Location: PIPING SUMP X <br />Sum Location: <br />Sum Location: <br />Sum Location: <br />S ill structures are free of water, deNbris,Nand hazardous substance. <br />7 containment <br />w <br />Tank 1– Contents: FILL BUCKET X Tank 3 –Contents: <br />X Tank 4 – Contents: <br />Tank 2 – Contents: <br />areas are free of water, debris, and hazardous substance.-, <br />8 Under -dispenser containment <br />Y N NA <br />X Dis enser 9 /10 <br />Dis enser 1 / 2 <br />4 X Dis enser 11 <br />Dis enser 3 / 4 <br />X Dis enser 13 <br />R <br />Dis enser 5 / 6 <br />X Dis enser 1 S / 16 , � <br />Dis enser 7 / 8 <br />dA DATE DONE <br />PAPERWORK INSPECTION <br />X <br />08/17/2015 <br />9 Monitoringsystem certification has been completed. within act 12 months. d timeframe. X <br />uire <br />03/24/2015 <br />10 secondarycontainment tests have been com leted wn the re <br />leted within the ast ear. X <br />08/17/2015 <br />11 S ill containment structure (bucket)testingwas com <br />Tank tightness testing was com leted within re uired timeframe. <br />X --- <br />_ __12 <br />08/22/2014 <br />12X <br />13 Line ti htness testingwas com leted within re uired timeframe. SEE COMMENTS <br />14 Other re uired testin maintenance was completed within required timeframe. <br />X <br />03/24/2015 <br />Test: Cr»ieual S1s989a SeQonda s ntaieeetittestin )uE Q3124/2018 <br />Test/Maintenance: <br />Test/Maintenanee: 4� <br />Y N NA <br />FACILITY EMPLOYEE TRAINING <br />15 All facili em to ees have received the re uired on -the= ob training within the past year. X <br />30 da s have received the re ` fired on -the -'tib trainin . X <br />16 All facili em to ees hired within the ast <br />section on the olio to a e, and wilt require <br />$ P g <br />Note: Any answer of "N" should be explained in the comment <br />follow-up fiction. . -. <br />1 <br />" Nnv em4r 2004 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.