Laserfiche WebLink
1. <br />✓ <br />Three complete sets of &s (include manufacturer's specification Sofor proposed equipment to be installed). <br />2. <br />w"*"' <br />Plans drawn to scale in non -erasable print. <br />A. Steel -clad with <br />3. <br />Le <br />Plot plan to show location of tanks and all associated piping. <br />MANUFACTURER <br />_ (2) <br />Vacuum applied to interstitial space. <br />_ S. Fiberglass <br />4. <br />V/ <br />Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />Vacuum applied to interstitial space. <br />_ (3) <br />/ <br />_ C. Non -clad steel <br />tank [Section 2635 (a) (2) (A)] <br />5. <br />✓ <br />Tank cross-sectional diagram. <br />Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />6. <br />Detail of tank, associated piping, excavation and cover. <br />CORROSION P•• <br />corrosion specialist. <br />_ (3) <br />7. <br />_✓ <br />Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, <br />Chapter 16, <br />M i11'. <br />..MKINU•.�._. <br />Article 3, Section 2631 (b) & 26353 <br />8. <br />✓ <br />Verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. <br />9. <br />/ <br />,/ <br />Manufacturer Is'written installation instructions for tank(s), piping, monitoring devices, etc. <br />10. <br />_1__,� <br />At the installation site, prior to installation, a tightness test shall be performed on both primary <br />(10) and <br />secondary (2°) containment systems before covering. [Section 2635 (a) (3) & (4)] <br />11. <br />✓ <br />Tank integrity test required upon completion of installation with tank in operating condition. Test <br />results to be <br />submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, <br />Division 20, <br />Chapter 6.7, Section 25291 (h)] <br />12. <br />TANK COMPOSITION <br />v <br />V <br />13. TANK((ss)�TO BE INSTALLED <br />`® <br />A. Steel -clad with <br />fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings. <br />_(1) <br />MANUFACTURER <br />_ (2) <br />Vacuum applied to interstitial space. <br />_ S. Fiberglass <br />COMPOSITION <br />Installation instructions require an air test and soap bubble test prior to installation. <br />_ (2) <br />Vacuum applied to interstitial space. <br />_ (3) <br />Hydrostatic annular (primary tank pressure test). <br />_ C. Non -clad steel <br />tank [Section 2635 (a) (2) (A)] <br />s <br />_ (1) <br />Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />_ (2) <br />CORROSION P•• <br />corrosion specialist. <br />_ (3) <br />LISTED <br />M i11'. <br />..MKINU•.�._. <br />v <br />V <br />13. TANK((ss)�TO BE INSTALLED <br />`® <br />A. Steel -clad with <br />fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings. <br />_(1) <br />Tested at the installation site using an electric resistance holiday detector. <br />_ (2) <br />Vacuum applied to interstitial space. <br />_ S. Fiberglass <br />_ (1) <br />Installation instructions require an air test and soap bubble test prior to installation. <br />_ (2) <br />Vacuum applied to interstitial space. <br />_ (3) <br />Hydrostatic annular (primary tank pressure test). <br />_ C. Non -clad steel <br />tank [Section 2635 (a) (2) (A)] <br />s <br />_ (1) <br />Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />_ (2) <br />Field installed cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />_ (3) <br />Impressed current systems to be inspected no less than every 60 days. <br />E <br />