Laserfiche WebLink
�rRs <br />NEW UNDERGROUND STORAGE TANKS - PLAN ADDITIONL CORRECTION SHEET <br />The following checked and/or underlined items are to be addref,,!qr_; <br />GENERAL <br />f ra ra 4 wr'S i : "?t ��MIY tQ <br />rovUl or these !� <br />Ql <br />Provide the name and address of the ft,tt-;, is c i i'y�'n urs , d�3ril' - r @° i <br />�3 Yms �, t Drfy o��ossiotl <br />CEJ r I.:: f�S �- keN9 <br />2. Provide the name. address, and phone num5¢ s�! of,#e-contl �ctot f-j3of `'efity <br />owner(s), and operator(s). Gii` �i µ .�,„ <br />or !oC31 <br />Provide four complete sets of plans. Ane to ret�o-irtetl°�yyha�fc�''���� <br />Iralude specification sheets. equipment0r�C" $,,, mogttorlti+;rand response <br />plans. <br />,4. Provide plans to scale in nonerasable blueprint. , <br />CONSTRUCTION STANDARDS' � <br />�K--- 1. Locations and number of tanks. <br />._ () A -I .pians <br />-27- I <br />Byz <br />_0j&_2- Type of tank(s) to be installed. A.1. pit.,� y �� s �`Y y+est <br />A. Steel clad with fiberglass reinforced plastic. serv��``~vw p`( <br />1. 35,000 to 40,000 volt Holiday Test required before "setting" tanks) <br />in ground. <br />B. Fiberglass, <br />1. Striker plate dimensions and materials. <br />2. Striker plates under all accessible openings. <br />C. Nonclad steel <br />I. Cathodic protection provided (including nuts, bolts. washers, etc.). <br />a. Approved by a corrosion engineer or NACE technician. <br />b. Document stating inspection method and frequency (Minimum semi- <br />annual inspection required). <br />_--D. Other types of tanks T9 U5 co <br />I. Construction specification standards for durability. <br />(2/ 3- Tank Capacity (List specific gallonage). 0)/o,000 <br />OC 4, Contents to be stored in each tank (Be specific). <br />A. Verification of product compatability with the tank(s). piping, monitoring <br />device(s). epoxy or silicone glues, etc. <br />1. List testing organi ation and approval. <br />1,.ee ou. - <br />O«5. Provide manufacturers written installation instructions. (Include all piping, <br />monitors. tans .etc. �v<a'Pd 16u/ 4&,,e <br />Note - NFPA 30 Test required before covering tank and systems. NFPA 30 Test <br />is ris r <br />is BOTH the Primary and Secondary containment systems. <br />Double walled tanks using pressure or vacuum testing to monitor annular <br />space are exempt from testing secondary container. <br />Note - NFPA 329 "Precision Test" required upon completion of installations. <br />neettesC result copy to be sent directly to this department from the <br />testing company. <br />