My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
983
>
2300 - Underground Storage Tank Program
>
PR0231691
>
COMPLIANCE INFO_1985-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 4:52:34 PM
Creation date
6/3/2020 9:50:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2000
RECORD_ID
PR0231691
PE
2361
FACILITY_ID
FA0003593
FACILITY_NAME
Nella Oil #487
STREET_NUMBER
983
STREET_NAME
MOFFAT
STREET_TYPE
Blvd
City
Manteca
Zip
95336
APN
221-15-06
CURRENT_STATUS
01
SITE_LOCATION
983 Moffat Blvd
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231691_983 MOFFAT_1985-2000.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />OPTTON'lA 0 <br />ARTICLE 3, SECTION 2631 <br />VEHICLE 0 NONMOTOR VEHICLE" FUEL TANK <br />CONSTRUCTION STANDARDS <br />1. Secondard containment provided. <br />2. Primary containers shall be product tight. Qe,-L sf` <br />3. Secondary containers 5 c-' <br />A. Thickness, density, composition. and product compatibility. <br />B. Sized to contain unauthorized releases for sufficient time to allow <br />detection and removal. <br />." Secondary container volumetric requirements <br />A` Single primary container - 100%. <br />Q. Multiple primary containers - 150% of largest primary container or <br />10% above aggregate. <br />1. Document interproduct compatibility ok <br />L 5. Secondary containers open to rainfall. <br />A. Volumetric requirement c 24 hours of 25 year storm in addition to <br />primary container volumes. <br />0_._`' _ 6. Pore space of granular material used as backfill for.the primary containers. <br />A. Refer to Section 2631(g). <br />7. Secondard container equipped with a collection system. <br />A. Designed to: <br />I. Accumulate <br />2. Temporarily store <br />3. Permit removal of: <br />a. Precipitation <br />b. Subsurface infiltration <br />C. Released hazardous substances from primary container(s). <br />8, Floor of Secondary container <br />A. Constructed on firm basel �► 5 <br />Q. Sloped to collection sump (1/8" per foot). <br />d 1. One or more access casings installed in sump <br />a. Sized to allow removal of collected liquid <br />b. Extend to ground surface <br />Perforated in sump region. <br />dCovered with a locked waterproof cap or within a secured facility <br />Thick enough to withstand anticipated stresses <br />Construction materials: <br />1) Are not weakened -by stored product <br />V012) Will not donate. capture, or mask constituents to be analyzed. <br />9. Membrane liner specifications: <br />A. Refer and comply with Article 3, Section 2631 j, k, 1, and m. <br />
The URL can be used to link to this page
Your browser does not support the video tag.