My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
983
>
2300 - Underground Storage Tank Program
>
PR0231691
>
COMPLIANCE INFO_1985-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 4:52:34 PM
Creation date
6/3/2020 9:50:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2000
RECORD_ID
PR0231691
PE
2361
FACILITY_ID
FA0003593
FACILITY_NAME
Nella Oil #487
STREET_NUMBER
983
STREET_NAME
MOFFAT
STREET_TYPE
Blvd
City
Manteca
Zip
95336
APN
221-15-06
CURRENT_STATUS
01
SITE_LOCATION
983 Moffat Blvd
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231691_983 MOFFAT_1985-2000.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y MEL BOKIDES PETROLEUM INC. <br />2191 NAVY DRIVE STOCKTON, CA 95206 <br />M.B.P. CARDLOCK.No. 2 <br />983 MOFFAT BLVD <br />nkVMCA, CA 95336 <br />OVERFILL PROTECTION <br />(209) 943-2011 <br />J <br />ENVIRONMENTAL HEALTH <br />PERMIT/SERVICES <br />Prior to delivery of fuels, a visual monitoring of the <br />liquid level of the tank to be filled shall be performed. <br />The station operator shall control the visual monitoring <br />and filling of the tanks. <br />The tank to be filled shall have an available capacity of <br />103% of the load to be dropped into it or the total load <br />• plus 200 gallon capacity, whichever is less, as determined <br />by storage tank visual monitoring. <br />The load to be dropped into the underground tank shall be <br />monitored either offsite by the batchh plant into the <br />truck or onsite via a meter on the truck into the underground <br />tank. <br />SIGNATURE: Operator <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.