Laserfiche WebLink
INTE SPECIFIC SAFETY PLAN <br />INTRODUCTION <br />This document describes the health and safety procedures for the - <br />activities planned in nPrforming a preliminary site investigation at <br />All subcontractors will follow this plan. The prime respo personib 1 ty fod <br />employee safety lies with each company that is involved in the work <br />for it's own employees. It is expressly intended that all project <br />work will comply with applicable sections of the California <br />occupational Health and safety code. All parties working on this <br />project will maintain a general responsibility to identify and <br />correct any health and safety hazards and are responsible for working <br />in a safe manner. <br />Rey Personnel <br />Project personnel who will have overall responsibility for the saf e <br />operation of this are: <br />Site Contact: <br />Project manager and <br />Site Safety Officer: <br />Elite IV__ Contractors (209) 461 6337 <br />fax 461 6342 <br />Project Manager and Safety Officer Responsi bili ties: <br />* To conduct initial site safety training for all project <br />field team members as described in this document, <br />* To assure ail field team personnel have read and <br />understand the Health and Safety Plan, <br />* To assure that all work performed on this project is <br />conducted in a safe manner, <br />* To coordinate with field personnel fire -watch, traffic <br />control and site security, <br />SITE SkFETY PLAN (SSP) - 1 <br />