My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
983
>
2300 - Underground Storage Tank Program
>
PR0231691
>
COMPLIANCE INFO_1985-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 4:52:34 PM
Creation date
6/3/2020 9:50:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2000
RECORD_ID
PR0231691
PE
2361
FACILITY_ID
FA0003593
FACILITY_NAME
Nella Oil #487
STREET_NUMBER
983
STREET_NAME
MOFFAT
STREET_TYPE
Blvd
City
Manteca
Zip
95336
APN
221-15-06
CURRENT_STATUS
01
SITE_LOCATION
983 Moffat Blvd
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231691_983 MOFFAT_1985-2000.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTE SPECIFIC SAFETY PLAN <br />INTRODUCTION <br />This document describes the health and safety procedures for the - <br />activities planned in nPrforming a preliminary site investigation at <br />All subcontractors will follow this plan. The prime respo personib 1 ty fod <br />employee safety lies with each company that is involved in the work <br />for it's own employees. It is expressly intended that all project <br />work will comply with applicable sections of the California <br />occupational Health and safety code. All parties working on this <br />project will maintain a general responsibility to identify and <br />correct any health and safety hazards and are responsible for working <br />in a safe manner. <br />Rey Personnel <br />Project personnel who will have overall responsibility for the saf e <br />operation of this are: <br />Site Contact: <br />Project manager and <br />Site Safety Officer: <br />Elite IV__ Contractors (209) 461 6337 <br />fax 461 6342 <br />Project Manager and Safety Officer Responsi bili ties: <br />* To conduct initial site safety training for all project <br />field team members as described in this document, <br />* To assure ail field team personnel have read and <br />understand the Health and Safety Plan, <br />* To assure that all work performed on this project is <br />conducted in a safe manner, <br />* To coordinate with field personnel fire -watch, traffic <br />control and site security, <br />SITE SkFETY PLAN (SSP) - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.