My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
983
>
2300 - Underground Storage Tank Program
>
PR0231691
>
COMPLIANCE INFO_1985-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 4:52:34 PM
Creation date
6/3/2020 9:50:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2000
RECORD_ID
PR0231691
PE
2361
FACILITY_ID
FA0003593
FACILITY_NAME
Nella Oil #487
STREET_NUMBER
983
STREET_NAME
MOFFAT
STREET_TYPE
Blvd
City
Manteca
Zip
95336
APN
221-15-06
CURRENT_STATUS
01
SITE_LOCATION
983 Moffat Blvd
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231691_983 MOFFAT_1985-2000.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S ING PROTOCOL FOR ROUTINE TANK OVALS <br />The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be <br />representative of native soils beneath the tank's invert (tank's bottom) at a collection depth not to exceed 2 - 4 feet. If <br />contamination is documented during closure, an Unauthorized Release Notification must be completed and submitted within five <br />(5) working days pursuant to California Health & Safety Code, Section '_'5295. <br />TANK I TANK SIZE <br />(Gallons) <br />• '� <br />MINIMUM NUMBER <br />of SOIL SAMPLES <br />LOCATION OF SOIL SAMPLES <br />< 1,000 I per Tank Fill OR Pump End of Tank <br />1,000 - 10.000 2 per Tank I at each End of Tank <br />> 10.000 3 or More Ends and Middle OR generally <br />per Tank spaced aiono :he ieneth of the Tank <br />PIPING A.NTD STOCKTILE <br />1 gamnie >vPn• )n ii,ni ter <br />7 tamnlr• ?VPN l0 minir v51rnq <br />TANK <br />TANK <br />TANK SIZE MINIMUM NUMBER <br />( (Gallons) ( of SOIL SAMPLES <br />LOCATION of SOIL MLNIMUM NUMBER of <br />( SAMPLES + WATER SAMPLES <br />I LOCATION of SOIL SAMPLES <br />< 10.000 <br />(Gallons) <br />From wail next to tank <br />Single Tank <br />2 <br />ends at soil/ groundwater <br />1 <br />1,000 - 10,000 <br />I 5 per Tank <br />Center and Ends OR Sides of Tank <br />interface <br />> 10,000 <br />5 OR More per Tank <br />> 10.000 ORI <br />From wall next to tank <br />Tank Cluster <br />4 ends at soil/ I <br />[aroundwater interface <br />SLAB PRESENT LN THE T.LtiX PIT <br />Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in order <br />to collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br />TANK <br />TANK SIZE <br />MINIMUM NUMBER <br />I LOCATION of SOIL SAMPLES <br />T <br />(Gallons) <br />of SOIL SAMPLES <br />3 per Tank <br />Center and Ends OR Sides of Tank <br />1,000 - 10,000 <br />I 5 per Tank <br />Center and Ends OR Sides of Tank <br />> 10,000 <br />5 OR More per Tank <br />Ends and Middle and generally spaced along <br />the length of the Tank <br />EH 23 046 (Revised 9/11/96) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.