Laserfiche WebLink
tgOURCf3 <br /> STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD W� , <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> I I <br /> C1t If OR H.r <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ) 1 NEW PERMIT ❑ 3 RENEWAL PERMIT X 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLO <br /> ONE ITEM ❑ 2 INTERIM PERMIT F-14 AMENDED PERMIT E:] 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVE ®, <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: © P F N <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.# B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAYNEAR) L, g D. TANK CAPACITY IN GALLONS:/ O poDQo <br /> II.TANK CONTENTS IF A-1 IS MARKED,COMPLETE ITEM C. ^?/rh <br /> A. 1 MOTOR VEHICLE FUEL Q 4 OIL B. C. #is REGULAR UNLEADED ❑ 3 DIESEL ❑ 6 AVIATION GAS <br /> ❑ 2 PETROLEUM El 80 EMPTY 1 PRODUCT ib PREMIUM UNLEADED E::] 4 GASAHOL ❑ 7 METHANOL <br /> lc MIDGRADE UNLEADED ❑ 5 JET FUEL ❑ 8 M85 <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER(DESCRIBE IN ITEM D.BELOM <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF ® i DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING OR ❑ 5 GLASS LINING ® 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 100°.6 METHANOL? YES 4 NO— <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION El91 NONE F-195 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL,BtC. SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE YES NO STRIKER PLATE YES NO DISPENSER CONTAINMENT YES NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A(D 2 PRESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A©2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A Q 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U B 100^/, METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑1 MECHANICAL LINE LEAK [:] IGHT <br /> 2 LINE TNESS ❑3 CONTINUOUS INTERSTITIAL �4 ELECTRONIC LINE ❑5 AUTOMATIC PUMP ❑ 99 OTHER <br /> DETECTOR TESTING MONITORING LEAK DETECTOR SHUTDOWN <br /> V.TANK LEAK DETECTION <br /> n❑ 1 VISUAL CHECK ❑ 2 MANUAL RECONCILIATION MONITORING <br /> ❑ 3 M�ORING ❑ 4 AUTOMATGAUGING IC TANK ❑ 5 GROUND MONITORING TER ❑6 TESTING <br /> �-�+ 7 MONITORING INTERSTITIAL ❑ 8 SIR E] 9 WENK LY MANUAL F-110 MOTESTINGHL TANK E] 95 UNKNOWN ❑99 OTHER <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PLACE) <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO❑ <br /> SU STANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER P AL,YfOFP,glyyRr,,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT <br /> TANK OWNER'S NAME DATE. 1 95::� J <br /> (PRINTED 4 <br /> SIGNATUR <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION If FACILITY# 1905 5q5 TANK# ®Q(p <br /> STATE I.D.4 ❑❑ ❑❑ 3 / I lei q / o 111 t7ll`f I <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE � G <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APP�ON-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILEDC MUST BE COMPLETED FOR INSTALLATIONS.THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLOT RLE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THWERGROUND STORAGE TANK REGULATIONS <br /> FORM B (6-95) ('jq_> 1 I <br />