Laserfiche WebLink
Jul 28 06 08:47a Mike Dotten 209-533-2650 p.1 <br />Facility Name: Olympian Cardlock (Page 3) <br />In -Tank Gauging / SIR Equipment: <br />®Check this box if tank gauging is used only for inventory control. <br />❑Check this box if no tank gauging or SIR equipment is installed and disregard the following section. <br />C_mmnlpan the rnllnuv:nn ohn..l.l:aa. <br />® Yes <br />® Yes <br />❑ No* <br />[7 No$ <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Were all tank -gauging probes visually inspected for damage and residue buildup? <br />® Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />® Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />® Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />® Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* T. !hn II &-1....- dee.. .1... 6..__...�.a <br />- --- - . ____ .-- --................. ....ase.avaeaaw wcac urn WTHE IJV UUN-rcutCO. <br />G. Line Leak Detectors (LLD): <br />❑ Check this box if LLDs are not installed and disregard the following section. <br />® Yes <br />❑ No* <br />❑ N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(Check all that apply) Simulated leak rate: ®3 h.; ❑ 0,2 <br />g.p. ❑ 0.1 g.p.h ; g.p.h. <br />® Yes <br />0 No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />® Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />® NIA <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />NIA <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />1Z N/A <br />or fails a test? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />® NIA <br />® Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />H. Comments: <br />