Laserfiche WebLink
11 <br />SWRCB, January 2002 <br />Page `of e <br />Fac{li is Not .. ed With Fill Riser Containment Sum s <br />Fill Riser ContatnmrniS>}xn{zs axe O"resexu, but were Not Tested U <br />es# Method Developed By: <br />U Sump Manufacturer <br />U Industry Standard U P77essio-nal Engineer <br />U other (Speco) <br />Test NkUW, <br />U Pressure <br />U Vacuum <br />U Hydrostatic <br />U Other (Specffy) <br />Test Equip scdr <br />Equipmen� Resohrti <br />Fill SLLME # <br />FIJI Sump# <br />Fill Sump # Ltme # <br />Diameter. <br />Sump Depth- <br />Hoighl from Tank 'fop to Top <br />Hi est Pi in Pe�eirati0W. <br />Height from Tank Top to Lowest <br />Electrical Peuetratidn: <br />Condition. of sump prior to <br />testin <br />onion 6tS=p Tested <br />M&Tla : <br />Wait time between sppiyrag <br />prenve/vacuumlwater and <br />starting test: <br />Test StartTime: <br />Initi Reaclln. <br />Test End Time: <br />inaf keadin <br />' <br />Test Duration: <br />t:'lrali in Reediu -R <br />. <br />Pass/Fail Throsliwid'os <br />1� thmit ? <br />U Yes U No <br />U Yea U Na <br />U Yes U Na <br />U Yea No <br />Does the senso arm when <br />• eithor prod � or water is <br />U Yes U No U NA <br />U Yes U No U NA <br />U Yes U No U NA <br />U No U NA <br />detected <br />Was asor removed for testing? <br />U Yes U No U NA <br />U Yes U No U NA <br />U Yes U No U NA <br />U Yes o U NA <br />as sensor properly replYaccd and <br />erified futretionai Ricer <br />U Yes U No U NA I <br />U Yes U No U NA <br />U Yes U No U NA. <br />U Yes U No <br />Comments — hide iii ormation onre airs made xo LeLZM, and recommended ollos�- ar ailed xesrs <br />