Laserfiche WebLink
g ONISYSTEM CERTIF ' NTION <br />F s <br />. e By All Jurisdictions <br />Within the State of Ca is <br />` 'Authority Cited: Chapter 67, Health and Safety Code; Chapter 16, Division 3, Title 23, California Code of Regulations <br />This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be prepared <br />for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank <br />system owner/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems within 30 <br />days of test date. <br />A. General Information <br />Facility Name: � lXAZY $2 /__.-� <br />Bldg. No.: <br />�7 <br />Site Address: g z �i� <br />/ <br />City: �,�� { e Zip: 2 _3 3 <br />Facility Contact Person: <br />Contact Phone No.: ( ) <br />Make/Model of Monitoring System: <br />Date of Testing/Servicing: <br />B. Inventory of Equipment Tested/Certified <br />Check the appropriate boxes to indicate ecic ui ment ' ted/serviced: <br />Tank ID: <br />Tank ID: y I w <br />❑ In -Tank Gauging Orobe. Model: 2r? �? <br />❑ In -Tank Gauging Probe. Model: s�- -%.< �? <br />❑ Annular Space or Vault Sensor. Model: !!* 9411901' �Y <br />❑ Annular Space or Vault Sensor. Model: <25 <br />❑ Piping Sump / Trench Sensor(s). Model: 1-01 <br />❑ Piping Sump / Trench Sensor(s). Model: o _ <br />❑ Fill Sump Sensor(s). Model: A ' <br />❑ Fill Sump Sensor(s). Model: �g� <br />❑ Mechanical Line Leak Detector. Model: LIXX <br />❑ Mechanical Line Leak Detector. Model: Z=x V <br />Cl Electronic Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. Model: <br />❑ Tank Overfill / High -Level Sensor. Model: <br />❑ Tank Overfill / High -Level Sensor. Model: <br />❑ Other (s ci a ui ment and model in Section E on Pae 2 . <br />❑ Other (s i e ui ment and model in Section E on <br />Tank ID: 6e4 4 <br />Tank ID: <br />❑ In -Tank Gaug' g Probe.. Model: — <br />❑ In -Tank Gauging Probe. Model: <br />13 Annular Space or Vault Sensor. Model: e. -3 90 ifL.ef- <br />❑ Annular Space or Vault Sensor. Model: <br />❑ Piping Sump / Trench Sensor(s). Model: <br />❑ Piping Sump / Trench Sensor(s). Model: <br />❑ Fill Sump Sensor(s). Model: <br />❑ Fill Sump Sensor(s). Model: <br />❑ Mechanical Line Leak Detector. Model: 15� 1 "l 5/ <br />❑ Mechanical Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. Model: <br />7'0: Tank Overfill / high -Level Sensor. Model: <br />❑ Tank Overfill / High -Level Sensor. Model: <br />❑ Other �spEitK e ui ment type and model in Section E on Pae 2). <br />E3 Other (s i e ui ment and model in Section E on Pae 2). <br />Dispenser ID: a -z---- <br />Dispenser ID: ---- <br />1 <br />Q Dispenser Containment Sensor(s). Model: `�C <br />13 -Dispenser Containment Sensor(s). Model: ' r <br />Uj Shear Valve(s). <br />Valve(s). <br />❑ Dis ' ,nser Containment Float(s) and Chain(s). <br />❑ Dis nser Containment Float(s) and Chain(s). <br />Dispenser ID: <br />Dispenser ID: <br />U• E')ispenser Containment"Sensor(s). Model: Z <br />Q Hispenser Containment Sensor(s). Model: r <br />U Shear Valve(s). <br />@-Shear Valve(s). <br />❑ Dispenser Containment Float s) and Chain(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />Dispenser ID: <br />Dispenser ID: <br />[d'6spenser Containment Sensor(s). Model: °?- gip' <br />❑ Dispenser Containment Sensor(s). Model: <br />shear Valve(s). <br />❑ Shear Valve(s). <br />(313ispenser Containment Float(s) and Chain(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />*If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility. <br />C. Certification- I certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers' <br />guidelines. Attached to this Certification is information (e.g. manufacturers' checklists) necessary to verify that this information is <br />correct and a Plot Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports, I have also <br />attached a copy of the report; (check all that apply): ys em set-up EYA' la history port <br />Technician.Name (print): $0,217 R1 4, r <br />Signature: <br />Certification No.: C�),S - C9 r <br />License. No.: <br />Testing Company Name: 11ei V _t'l , r <br />Phone No.:C <br />Site Address: <br />Date of Testing/Servicing:�� <br />Page 1 of 3 03/01 <br />Monitoring System Certification <br />Post -it® Fax Note 7671 Date -7 pages® <br />r <br />From <br />t V <br />Co./Dept. Co. <br />Phone # <br />Phone # <br />Fax # <br />Fax # <br />