Laserfiche WebLink
Monitoring System Certification <br />Site Address: <br />F. Iii -Tank Gauging/ SIR Equipment: <br />P. 03 <br />4DRAFT <br />Date of Testing/Servicing: <br />❑ Check this box if tank gauging is used only for inventory con :rol. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the folio lag checklist: <br />❑ Yes <br />O No* I Has all input wiring been imp <br />-d-Yes <br />❑ No* Were all tank gauging probes, <br />d Yes <br />O No* Was accuracy of system produ <br />7 :Yes <br />O No* Was accuracy of system water <br />❑ Yes O No* Were all probes reinstall, <br />O Yes O No" I Were all items on the eq, <br />" in the sectfart II, below, describe how and <br />G. Line Leak Detectors (LLD): <br />proper entry and termination, including testing for <br />�t manufacturer's Maintenance checklist comp <br />these deficiencies were or will be corrected, <br />❑ Check this box if LLDs are not installed. <br />Complete the follo lug checklist: <br />Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD pe <br />D NIA (Check all that apply) Simulated leak rate: e3 g.p.h.'; O o.l g.p.h.=; U 0 h <br />.2 g.p_.' <br />Notes: 1. Required for equipment start-up ecrtification And annual certification. <br />2. Unless mandated by local agency, certification required only for electronic LLD start-up. <br />Yes Q No* Were all LLDs confirmed operational and accurate within regulatory requirements177" <br />Yes O No* Was the testing apparatus properly <br />..Yes ❑ No*: For mechanical LLD,, does the LL <br />* In the Section H, belt <br />H. Comments: <br />describe how and when <br />LIuucr uow it it amects a leav <br />:ally shut off if the LLD detects a 1� <br />Bally shut off if any portion of the <br />matically shut off if any portioi <br />connections been visually inspectee <br />maintenance checklist compacted? <br />were or will be corrected. <br />monitoring system <br />of the nronitonng system <br />CALm-as Page 3 90 <br />11/15197; <br />O Yes. <br />O No* <br />For electronic LLDs, docs the turbi <br />A N/A <br />O Yes <br />Q No* <br />For electronic LLDs, does the Curb. <br />QUA <br />or disconnected? <br />No* <br />For electronic LLDs, does the t <br />1V /A <br />mlfanctions or fails a test? <br />E❑ <br />O NO«� <br />For electronic LLDs, have all accI'NoCIWere <br />ell items on the equipmcnr mt <br />* In the Section H, belt <br />H. Comments: <br />describe how and when <br />LIuucr uow it it amects a leav <br />:ally shut off if the LLD detects a 1� <br />Bally shut off if any portion of the <br />matically shut off if any portioi <br />connections been visually inspectee <br />maintenance checklist compacted? <br />were or will be corrected. <br />monitoring system <br />of the nronitonng system <br />CALm-as Page 3 90 <br />11/15197; <br />