Laserfiche WebLink
Install a new 3" ICONboot enetration O °°°� Legend <br /> p � <br /> on the existing 3" FRP vapor line � G Gasoline-87 <br /> 0 • Gasoline-89 <br /> penetration. • Gasoline-91 <br /> O Diesel <br /> O E 85 <br /> ® E 100 <br /> • Vapor <br /> OAnnular <br /> • Submersible Turbine Pump <br /> Q TLM Probe <br /> #1 olive-87 #2 Gasoline-91 #3 Diesel I Monitoring System Panel <br /> O O Q 9 Incon Monitoring System <br /> • •0 • ❑ O•• • 0 8 Switch <br /> encY Shut-Off <br /> CQ� Overfill Alarm <br /> S k 4 k 12 k r�' b Float&Chain <br /> ❑ Sump/UDC Sensor <br /> m^I a Interstitial Sensor <br /> 0 Vacuum Sensor <br /> �--� 0 Line Leak <br /> CC3 Detector <br /> 4-1 -0 ISD Flow Meter <br /> The leak could not be located on test day. • ISD Pressure Sensor <br /> OG Spill Containment Kit <br /> Remove this dispenser and apply a vacuum over R VaporRecovery VST <br /> water to locate the leak(s). Make the required <br /> ter <br /> repairs. <br /> _o <br /> C U� <br /> O_ 0� <br /> N o <br /> This line could not be isolated or <br /> tested from the master unit. z °' o <br /> 9 Remove the dispenser and test z 0) <br /> 0 • from the satellite UDC. Repair as o <br /> z 0 needed. a = Z <br /> �0 3w 3 0� <br /> � a <br /> O m <br /> �O <br /> a Install a new 3"x 2" test boot on the <br /> ® 91 line in UDC #3/4. The dispenser <br /> will need to be removed for this M <br /> work. ' to <br /> � C0a <br /> 0 ci <br /> 0 Ci <br /> ., _Cz <br /> °' M Co <br /> z � <br /> Cowell Ave. <br />