My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
983
>
2300 - Underground Storage Tank Program
>
PR0231691
>
COMPLIANCE INFO_2010-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 4:58:56 PM
Creation date
6/3/2020 9:50:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2015
RECORD_ID
PR0231691
PE
2361
FACILITY_ID
FA0003593
FACILITY_NAME
Nella Oil #487
STREET_NUMBER
983
STREET_NAME
MOFFAT
STREET_TYPE
Blvd
City
Manteca
Zip
95336
APN
221-15-06
CURRENT_STATUS
01
SITE_LOCATION
983 Moffat Blvd
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231691_983 MOFFAT_2010-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
410
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,. .. <br />SECONDARY LINE TESTING MA2l 1 2015 <br />Test Method By: o Manufacturer • Industry Standard o Professional Engr o Other (see below) <br />Test Method Uses: • Pressure o vacuum o Hydrostatic o Other (see below) <br />Measuring Equipment Used: Pressure Gauge (range Oto 15 psig) <br />Descrintinn I ino Al 1 ino lig 1 :.a *s <br />Tank product <br />Gasoline - 87 <br />Gasoline - 91 <br />Diesel <br />Pipe manufacturer <br />Ameron <br />Ameron _ <br />Ameron <br />Pipe material <br />FRP <br />FRP <br />FRP <br />Primary pipe diameter (inches) <br />2 <br />2 <br />3 <br />Secondary pipe diameter (inches) <br />3 <br />3 <br />4 <br />Method of secondary pipe isolation <br />Termination Boot <br />Termination Boot <br />Termination Boot <br />Location of secondary pipe isolation <br />Sump <br />Sump <br />Sump <br />Estimated length of piping run (feet) <br />110 <br />80 <br />130 <br />(include length of branch runs) <br />PASS <br />FAIL <br />PASS <br />Wait time for pressure to stabilize (hr:min) <br />:10 <br />:10 <br />:10 <br />Test start time <br />10:10 AM <br />10:30 AM <br />10:44 AM <br />Initial pressure (psig) <br />5.0 <br />5.0 <br />5.0 <br />Test end time <br />11:10 AM <br />11:40 AM <br />11:44 AM <br />Final pressure (psig) <br />5.0 <br />0.0 <br />5.0 <br />Test duration (hr:min) <br />1:00 <br />1:10 <br />1:00 <br />Change in pressure (psig) <br />0.0 <br />5.0 <br />0.0 <br />Pass/Fail threshold (psig) <br />0.5 <br />0.5 <br />0.5 <br />TEST RESULT <br />PASS <br />FAIL <br />PASS <br />Comments: <br />!ols walton Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.