Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />RESPONSE PLAN --- PAGE 1 One form perfacility) <br />TYPE OF ACTION ❑ 1. NEW PLAN 0 2, CHANGE OF INFORMATION Rot. <br />I. FACILITY INFORMATION <br />FACILITY ID # (.igencv use only) —FT — ' <br />13USINESS NAME (Same as FACILITY NAME) 3 <br />Flyers #487 <br />BUSINESS SITE ADDRESS 103 <br />13USINESS SITE CITY Poi, <br />983 Moffat Blvd <br />1 Manteca <br />II. SPILL CONTROL AND CLEANUP METHODS <br />This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br />Business Plan (HMBP). <br />➢ if safe to do so, facility personnel will take immediate measures to control or stop any release (e.g., activate pump shut-off, etc.) and, if necessary, safely remove <br />remaining hazardous material from the UST system, <br />Y Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br />contain the hazardous material, but not greater than 30 calendar days, or sooner if required by the local agency. Recovered hazardous materials, unless still suitable <br />for their intended use, will be managed as hazardous waste. <br />➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br />effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR §66262.11 finds that <br />it is non -hazardous. Used absorbent material, reusable or waste, will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br />appropriately. <br />Y Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact Mth any <br />hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br />§66262.11 finds that it is non -hazardous. if the water has a petroleum sheen (i.e., rainbow colors), it is contaminated. A thick floating petroleum layer may not <br />necessarily display rainbow colors. Water (hazardous or non -hazardous) from sumps, spill containers, etc. will not be disposed to storm water systems. <br />Y We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br />1. I lazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br />2. Secondary containment is prone to damage from any equipment used to remove or cleanup hazardous material collected in secondary containment; <br />3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br />released product/waste, and the added material or resulting material front such a combination is not compatible with secondary containment. <br />III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br />PERIODIC ,MAINTENANCE. Spill control and clean-up equipment kept permanently on-site is listed in the facility's liazardous Materials Business Plan. This <br />equipment is inspected at least monthly, and atter each use, supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br />EQUIPMENT NOT PERMANENTLY ON-SITE, BUT AVAILABLE FOR USE iF NEEDED: Can Pete orrl y if applicable) <br />EQUIPMENT <br />LOCATION <br />AVAILABILITY <br />Absorbent R10 <br />In cans on dispenser Islands R20- <br />at least 2-35lbs bags R10 <br />Broom R" <br />In building °2' <br />at least 'I Rai' <br />RI2. <br />R22. <br />R32 <br />W. <br />R23. <br />R33, <br />R14. <br />R24. <br />R34. <br />R15, <br />R25. <br />R35. <br />IV. RESPONSIBLE PERSONS <br />THE FOLLOWING PERSON(S) IS/ARE RESPONSIBLE FOR AUTHORIZING ANY !YORK NECESSARY UNDER THIS RESPONSE PLAN: <br />N,virE R40. <br />TITLE R50. <br />A ell <br />Environmental Manager <br />NAMEAmanda <br />Rar. <br />TITLE R51. <br />Sid Provoast <br />Maintenance Manager <br />Maintenance <br />NAME Rae. <br />TITLE <br />Mike Teske <br />Maintenace Coordinator <br />NAME R43. <br />I <br />TITLE R53 <br />Matt Walling <br />Com liance Tech an <br />V. MONITORING INDE ISS <br />IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE, S' !F REr.F.ASE �4'ILI BG MADF. AS FOLLOWS: <br />® 1. ADDITIONAL SYSTEM TESTING OR DATA COLLECTION ® 2. INSPECTI L � PERSONS 03. RECALIBRATION OF EQUIPMENT R6 <br />Q 99. OTHER (Spccifft RGI1 <br />4ENInA <br />NX <br />UL:l r ®, <br />LIN -02213 -1/3 wnvnv.turldoes.org <br />Rev. 04102/08 <br />