Laserfiche WebLink
L <br />UNIFIED PROGRAIM CONSOLIDATED FORM <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Page I of 2) <br />TYPE OF ACTION ® I. NEW PLAN 9 2. CHANGE OF INFORMATION 490-1 <br />PLAN TYPE ® I. MONITORING IS IDENTICAL FOR ALI. USTs AT THIS FACILITY, 490'2 <br />(Check one heal on(j) ❑ 2. 'I'I IIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />1. FACILITY INFORMATION <br />FACT Lay ID # (Agency Use Only) <br />� <br />BUSINESS NAM F (Same as Facility Armee or DBA) 3. <br />Flyers #487 <br />BUSINESS SITE ADDRESS 983 Moffat Blvd. 103. <br />CITY Manteca 104. <br />II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency specified <br />h�the eyuipment manufacturers' instructions, or a_nnualiy, 3vhichever is more frequent. Such work must be performed by qualified personnel. (23 CCR §2632.2634, <br />MONITORING EQUIPMENT IS SERVICED ® I. ANNUALLY (D99.O'fIIER (Specify): 490.34 <br />440-3b <br />III, MONITORING LOCATIONS <br />❑ 1. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2, SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED 123 CCR§2632, 2634) 440'4 <br />IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHODS; ►chak i <br />MI <br />1. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CON'T'AINMENT VAULT(S) 440-5. <br />WITH AUDIBLE AND VISUAL ALARMS. 123 CCR §2632,2634) <br />SECONDARY CONTAINMENT 1S: ® a. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM 49". <br />PANEL MANUFACTURER: Veeder Root 490-7. MODEL #: TLS) -350 490.8. <br />LEAK SENSOR MANUFACTURER: Veeder Root 419. MODEL #(S): 0794380-420 490-10_ <br />_ <br />Q 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALT. TANK(S). (23 CCR §26431 a4o-1 E <br />PANE[. MANUFACTURER: 440-L2 MODEL #: 490'13_ <br />IN -TANK PROBE MANUFACTURER: 490.14. MODEL #(S): 49045 <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY 490.16. <br />❑ d. MONTHLY ❑ e. OTHER (Specify): 490.17. <br />490.18. <br />PROGRAMME_D_TESTS: ❑ a. 0.1 g.p.h. ❑ b. 0.2 g p.h. ❑ c. OTHER (Specify): 490.19. <br />_ <br />❑ 3. MONTHLY STATISTICAL, INVENTORY RECONCILIATION123CCR§2646.11 490.20. <br />❑ 4. WEEKLY MANUAL TANK GAUGING Iy1TG (23 Mt. §2645) TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS y t_.. <br />( ) i <br />_ _ <br />❑ 5. TANK INTEGRITY TESTING PER [23 CCR §2643.11 490.23. <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER S ecif 15044. <br />(P Y)�0.4°-2s. <br />490.26... <br />❑ 99. OTHER (Specity): 49° 27. <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Cleckall <br />lkat a <br />® I. CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE & VISUAL ALARMS. 490-23 <br />123 CCR SECONDARY CONTAINMENT IS:®a. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED [Id. UNDER VACUUM '40.29 <br />§2636) <br />PANEL MANUFACTURER: Veeder Root 440-0. MODEL#: TLS -35044031. <br />LEAK SENSOR MANUFACTURER: Veeder Root 490.32 MODEL #(S): 0794380-208 490-33. <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. ® a. YES ❑ b. NO 440-31 <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO '90-"- <br />tD2_ MECHANICAL LING LEAK DETECTOR (hILLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF 490.36. <br />PRODUCTFLOW WHEN A LEAK IS DFTECTED. (23 CCR§26361 <br />MLLD MANUPACTURER(S): Vaporless -090'37' MODEL #(S): 99L.D2000 4403a. <br />❑ 3. ELECTRONIC LINF. LEAK DETECTOR (F LLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS. (23 CCR§26361 340.39. <br />ELLD b• fANUFACTURER(S): 490-40.MODF(S},R 49041 <br />PROGRAMMED IN LINE LEAK TEST: ❑ a. MINIMUM MONT I PW.a i4fJTI1M TCN � ,'.0.1 g.p.h. 49042. <br />PUMP O 490.43 <br />OF A PIPING LEAK TRIGGERS AUTOMATIC SHUT `' ❑ a. YES ❑ b. N <br />ELLD DETECTION <br />ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHU'1'DO) [Ia. YES C1b. NO 440-44. <br />Cl 4. PITT 1NT-EGRITY TESTING. �� 490-45. <br />'' 1t �. 490.46. <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER' peclfy) a90-47. <br />❑ 5. VISUAL PIPE MONITORING. 490-48 <br />FREQUENCY: ❑ a. DAILY ❑ b. WEEKLY�tr11t= I y0. FSYST$nt OPERATED* 49D49 <br />9m <br />• Aifow•ed forfitabdii e_nx C: is onlyr HSC 23281.5(b)(� . - <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA. 123 Mt §2636(.)(3)] ° ° +90-s0 <br />❑ 7. NO REGULATED PIPING PER I IEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490.51. <br />❑ 99, OTHER (Specify) ago -s2. <br />440.33. <br />UPCF UST -D (12/2007) -1/4 wiviv.unidocs.org <br />