My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
983
>
2300 - Underground Storage Tank Program
>
PR0231691
>
COMPLIANCE INFO_2010-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 4:58:56 PM
Creation date
6/3/2020 9:50:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2015
RECORD_ID
PR0231691
PE
2361
FACILITY_ID
FA0003593
FACILITY_NAME
Nella Oil #487
STREET_NUMBER
983
STREET_NAME
MOFFAT
STREET_TYPE
Blvd
City
Manteca
Zip
95336
APN
221-15-06
CURRENT_STATUS
01
SITE_LOCATION
983 Moffat Blvd
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231691_983 MOFFAT_2010-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
410
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITdRING SYSTEM IFI I _. <br /> JL 2 2 2016 <br /> CERTIFICATION /TEST DATE: July 21, 2016 <br /> 7-7 <br /> A1. FACILITY A2. OWNER y <br /> Name Flyers#487 Name Flyers Energy LLC. <br /> Address 983 Moffat Blvd.,Manteca,CA 95336 Address 2360 Lindbergh Street,Auburn,CA 95602 <br /> Phone# 530-885-0401 Phone# 530-885-0401 <br /> Contact Amanda Appelt Contact Amanda Appelt <br /> .. ,,,, .,.. <br /> D. RESULTS OF TESTING/SERVICING <br /> Make/ Model of Monitoring System: Vee er- oot TLS-350 SN# 80749702205001 <br /> Software Version Installed: 329.01 <br /> Complete the following checklist: <br /> ■ Yes ❑ No" Is the audible alarm operational? <br /> ■ Yes ❑ No" Is the visual alarm operational? <br /> ■ Yes ❑ No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ■ Yes ❑ No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment <br /> will not interfere with their proper operation? <br /> ■ Yes ❑ Not' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modems) <br /> ❑ N/A operational? <br /> ■ Yes ❑ No" For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate <br /> positive shutdown? (check all that apply) N Sump/Trench sensors; E Dispenser Containment Sensors. <br /> ■ Yes ❑ No" Did you confirm positive shut-down due to leaks and sensor failure/disconnection? <br /> ❑ Yes ❑ Not' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no <br /> g _ ■ N/A mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? % <br /> ❑ <br /> Ye <br /> s' No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. ?' <br /> ElYes* ■ No Was any liquid found inside any secondary containment systems designed as dry systems? <br /> (Check all that apply) ❑ Product; ❑ Water. If yes,describe causes in Section E,below. <br /> ■ Yes ❑ No" Was monitoring system set-up reviewed to insure proper settings? Attach set-up reports,if applicable. <br /> Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> ,,..., 60" .. .. .:: .amu, M <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. COMMENTS <br /> r; <br /> ,....w,. .. <br /> ©2016 Watton Engineering,Inc. <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.