My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
983
>
2300 - Underground Storage Tank Program
>
PR0231691
>
COMPLIANCE INFO_2010-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 4:58:56 PM
Creation date
6/3/2020 9:50:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2015
RECORD_ID
PR0231691
PE
2361
FACILITY_ID
FA0003593
FACILITY_NAME
Nella Oil #487
STREET_NUMBER
983
STREET_NAME
MOFFAT
STREET_TYPE
Blvd
City
Manteca
Zip
95336
APN
221-15-06
CURRENT_STATUS
01
SITE_LOCATION
983 Moffat Blvd
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231691_983 MOFFAT_2010-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
410
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• REGEiva) <br /> SECONDARY LINE TESTING NOV 0 9 205 <br /> ENVIRONMENTAL <br /> Test Method By: o Manufacturer • Industry Standard o Professional Engr o Other(see below) <br /> Test Method Uses: • Pressure o Vacuum o Hydrostatic o Other(see below) <br /> Measuring Equipment Used: Pressure Gauge (range Oto 15 psig) <br /> Description Line#1 Line#2 Line#3 <br /> Tank product Gasoline-87 Gasoline-91 Diesel <br /> Pipe manufacturer Ameron Ameron Ameron <br /> Pipe material FRP FRP FRP <br /> Primary pipe diameter (inches) 2 2 3 <br /> Secondary pipe diameter (inches) 3 3 4 <br /> Method of secondary pipe isolation Termination Boot Termination Boot Termination Boot <br /> Location of secondary pipe isolation Sump Sump Sump <br /> Estimated length of piping run (feet) 110 80 130 <br /> (include length of branch runs) <br /> Wait time for pressure to stabilize (hr:min) :10 <br /> Test start time 10:10 AM <br /> Initial pressure (psig) 5.0 <br /> Test end time 11:10 AM <br /> Final pressure(psig) 5.0 <br /> Test duration (hr:min) 1:00 <br /> Change in pressure (psig) 0.0 <br /> Pass/Fail threshold (psig) 0.5 <br /> TEST RESULT PASS <br /> Comments: <br /> © 2015 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.