Laserfiche WebLink
UNIFIED PROGRAM CONSOI.,IDA'fED FOXNI <br /> UNDERGROUND STORAGE TAtlNK <br /> MONITORING PLAN —(Page 2 of 2) <br /> check al <br /> VI. UNDER DISPENSER CONTAINMENT(UDC)MONITORING hot apply <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ® L.CON'f[NUOUS ELECTRONIC IVIONiTORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) 490•54b <br /> LEAK MONITOR NIANUFACTURFR:Veeder Root _ 490-55' MODEL#:TLS-350 490.56. <br /> LEAK SENSOR MANUFACTURER:Veeder Root 490-57 MODEL fl(S):0794380-208 490-59. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL.ALARMS. ® a.YES ❑ b.NO 490.59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-60 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490.61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a.YES ❑ b.NO 490-6' <br /> UDC CONSTRUCTION IS: ® 1.SINGLE WALL ❑ 2.DOUBLE WALL 490-63 <br /> IF DOUBLE WALL: 490-641 <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LiQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK MTI I1N TIIF SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490"641> <br /> VII. PERIODIC SYSTEM TESTING <br /> ❑ 1.ELI)TESTING: T111S FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD TilAT ENHANCED 490.65 <br /> LEAK DETECTION(ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.123CCR;2644.11 <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERT'36 MONTHS. 490-66 <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490.67. <br /> VIII, RECORD KEEPING <br /> The following trronitoring/maintenance records are kept for this facility: 49o-6s <br /> ® a.ALARM LOGS ❑ b.ViSUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY'TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ is ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.E UiPMFNT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> ® <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 490-693 <br /> REFERENCE DOCUM ENTS MAiNTAINED AT FACILITY❑(Check all that appl)J <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 49o•69b. <br /> V) OPERATING MANUALS FOR ELECTRONIC AdONI TORiNG EQUIPMENT(Required) 490-69c. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAV 490-69e <br /> ❑ STATE. WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490-69£ <br /> STATISTICAL INVENTORY REC:ONCILiATION" <br /> F1 SWRCB PUBLICA'T'ION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-69S, <br /> ❑ OTHER(Specify): 490-69h490-69i <br /> ® This facility has a"Designated UST Operator'who has passed the California UST System Operator Exam administered by the international Code Council 490-70. <br /> ([CC). lite "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire"This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ lire facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> ➢ Nanre(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how nnany pages with additional information on specific monitoring procedures are attached to this plan. 490-71. <br /> The overfill prevention Is a flapper valve set to shut off at 95% <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> _bythis plan occurs;"2.)all conditions that indicate a possible release are investigated;and 3.j all t7tonitoring records are maintailned properly. <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: Amanda Appelt 490-72. TITLE:Environmental Manager 49073. <br /> NAME: Matt Walling 490.74 TITLE:Compliance Technician 490"75. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-tip action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my lutowledge. <br /> APPLICANT SIGNATUREDATE: 490.77. <br /> - ,r, / L,,zW <br /> 5/16/2012 <br /> REPRESENTING:0 1.Tank vr of O ma 490.76. <br /> APPLICANT NAME(print): 490.75. APPLICANTTITLE: 490.79. <br /> Amanda Appelt Environmental Manager <br /> UPCF UST-D(12/2007)-3/t nvw+v.un[docs.org <br />