Laserfiche WebLink
San Joaquin County <br /> 10 FILE COPY <br /> Environmental Health Department DIRECTOR <br /> Linda Turkatte,REHS <br /> s: ? 1868 East Hazelton Avenue <br /> Stockton, California 95205-6232 PROGRAM COORDINATORS <br /> Robert McClellon,RENS <br /> •' Jeff Carruesco, REHS, RDI <br /> Website: www,sjgov org/ehd Kasey Foley,REHS <br /> Rodney Estrada,REHS <br /> Phone: (209)468-3420 Adrienne Ellsaesser, REHS <br /> Fax: (209)464-0138 <br /> April 8, 2015 <br /> WALTON ENGINEERING INC <br /> PO BOX 1025 <br /> WEST SACRAMENTO, CA 95691 <br /> Re: NELLA OIL#487 SR0071835 <br /> 983 MOFFAT BLVD <br /> MANTECA,CA 95336 <br /> The. San Joaquin County Environmental Health Department (EHD) has completed the review of <br /> the application for a permit to. replace existing 3-inch FRP vapor line penetration in the 87 <br /> octane STP sump with a 3-inch Icon split repair penetration and install a new Icon test boot on <br /> 91-octane line in UDC 3/4 on the underground storage tank (UST) system at the above noted <br /> address. According to the permit requestor, no concrete will be broken during the proposed <br /> repair work. Prior to conducting any repairs on UDC 1/2 and UDC 8 SAT, once the <br /> determination as to the necessary repairs was made submit a permit application addendum for <br /> the necessary repairs. <br /> The permit has been approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Elena Manzo at (209) 953-7699 to arrange the following inspection <br /> appointments (a 48-hour notice is required for inspection appointments). Please be <br /> aware that inspections for emergency work must be scheduled within five days of permit <br /> approval. <br /> a. 24-hour hydrostatic test (or equivalent) on the 87-octane STP <br /> b. Secondary containment testing of 91-octane product line (related to UDC %test boot <br /> installation). <br /> Please be aware that the facility cannot operate the impacted UST system prior to <br /> the EHD inspection and approval. <br /> 4. Secondary containment testing for the installed components is required six months after <br /> installation. Provide 48 hours notification to the EHD when this test is scheduled. <br />