Laserfiche WebLink
San Joaquin County <br /> Environmental Health Department DIRECTOR . <br /> o Linda Turkatte,REHS <br /> 2a 1866 East Hazelton Avenue <br /> Stockton, California 95205-6232 PRocRa�rCOORDINATORS <br /> = Robert McClellon,REHS <br /> Jeff Carruesco,REHS,RDI <br /> Website: w�vw.sjgovorg/ehd Kasey Foley,REHS <br /> F o R Rodney Estrada,REHS <br /> Phone: (209)466-3420 Adrienne Ellsaesser,REHS <br /> Fax: (209)464.0136 <br /> April 8, 2015 <br /> WALTON ENGINEERING INC <br /> PO BOX 1025 <br /> WEST SACRAMENTO, CA 95691 <br /> Re: NELLA OIL#487 SR0071835 <br /> 983 MOFFAT BLVD <br /> MANTECA,CA 95336 <br /> The.San Joaquin County Environmental Health Department (EHD) has completed the review of <br /> the application for a permit to. replace existing 3-inch FRP vapor line penetration in the 87- <br /> octane STP sump with a 3-inch Icon split repair penetration and install a new Icon test boot on <br /> 91-octane line in UDC 3/4 on the underground storage tank (UST) system at the above noted <br /> address. According to the permit requestor, no concrete will be broken during the proposed <br /> repair work. Prior to conducting any repairs on UDC 1/2 and UDC 8 SAT, once the <br /> determination as to the-necessary repairs was made submit a permit application addendum for <br /> the necessary repairs. <br /> The permit has been approved with the following conditions: <br /> 1. Contact the local'fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Elena Manzo at (209) 953-7699 to arrange the following inspection <br /> appointments (a 48-hour notice is required for inspection appointments). Please be <br /> aware that inspections for emergency work must be scheduled within five days of permit <br /> approval. <br /> a. 24-hour hydrostatic test (or equivalent) on the 87-octane STP <br /> b. Secondary containment testing of 91-octane product line (related to UDC 3/test boot <br /> installation). <br /> Please be aware that the facility cannot operate the impacted UST system prior to <br /> the EHD inspection and approval. <br /> 4. Secondary containment testing for the installed components is required six months after <br /> installation. Provide 48 hours notification to the EHD when this test is scheduled. <br />