My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOSSDALE
>
444
>
2300 - Underground Storage Tank Program
>
PR0231692
>
COMPLIANCE INFO_1986-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 11:21:04 AM
Creation date
6/3/2020 9:51:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2000
RECORD_ID
PR0231692
PE
2361
FACILITY_ID
FA0000212
FACILITY_NAME
Mossdale Chevron
STREET_NUMBER
444
Direction
W
STREET_NAME
MOSSDALE
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
444 W MOSSDALE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231692_444 W MOSSDALE_1986-2000.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONI'T'ORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The Information on this monitoring <br /> program are conditions of the operating permit. Ile permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2641(h) CCR. <br /> Facility Name <br /> // <br /> Facility Address // <br /> A. Describe the frequency of performing e_monitoring. �f <br /> Tank -�- Cc C' i' h, L,t e7 r ( { ct r:rt- i JC ' t 1 <br /> Piping <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> lti�� a j c C t-tet•� . . <br /> Tank iZ -�.-L.; �f CLC LLf E. r c,y <br /> Piping , 1 <br /> C. Describe the locations) where the monitbring will be performed (facility plot plan <br /> should be attached): � <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining jhe uipmTnt: <br /> E. Reporting format for monitoring: <br /> (� 7 e <br /> Tank c 4 c, ` �l �'\c.c-c- -'� <br /> Piping <br /> F. Describe the preventive maintenance cheile for the monitoring equipment.- Note: <br /> Maintenance must be in accordance with the manufacturers' muintena ce schedule <br /> but not less tha evey L?months: C' �i-i c l et <br /> Cit �-E_� r3IF•.r :lE-, 1 _ <br /> G. Describe the training necessary for the operation of USS' system.`including piping<`c <br /> and the monitoring equipment: <br />
The URL can be used to link to this page
Your browser does not support the video tag.