Laserfiche WebLink
San Joaquin un <br /> u► DIRECTOR <br /> O it I <br /> Linda Turkatte, REHS <br /> s <br /> 1868 East Hazelton Avenue <br /> PROGRAM COORDINATORS <br /> Stockton, California 95205-6232 Robert McClellon,RENS <br /> • ' Jeff Carruesco,RENS,RDI <br /> Website: .SJgO . gC11 Kasey Foley,REHS A. <br /> Q��FORt� VOC /ehRodney Estrada,REHS <br /> Phone: (209)468-3420 Adrienne Ellsaesser,REHS <br /> Fax: (209)464-0138 <br /> March 9, 2015 <br /> PAUL SINGH <br /> AKAL DEVELOPMENT INC <br /> 6283 DEAN MARTIN WAY <br /> LAS VEGAS, NV 89118 <br /> Re: AUBURN 7700 INC Amended -SR0070498 <br /> 444 W MOSSDALE RD <br /> LATHROP, CA 95330 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of <br /> the application for a permit to install all new Wayne Ovation fuel dispensers, Bravo conversion <br /> frames, and conduct a system cold start after replacement of the Veeder Root battery on the <br /> underground storage tank (UST) system at the above noted address. The permit has been <br /> approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Elena Manzo at (209) 953-7699 to arrange the following inspection <br /> appointments (a 48-hour notice is required for inspection appointments). According to <br /> the service requestor, no piping modifications will take place during the proposed <br /> conversion frames installation. <br /> a. Sensor functionality: Functionality of the monitoring system, including functionality of <br /> all sensors must be verified to ensure that monitoring has been restored to meet the <br /> requirements of Title 23 California Code of Regulations and the Health & Safety <br /> Code. A copy of the alarm history, printed prior to the "cold start" of the Veeder Root <br /> system, shall be made available at the time of EHD inspection. <br /> b. Verification of conversion frames installation per the manufacturer's installation <br /> instructions <br /> c. Verification of the dispenser footprints contained by the under dispenser containment <br /> sumps (UDCs) and verification that all potential product piping leaks will be captured <br /> in the UDC. <br /> d. Visual inspection of the piping within the dispensers for any product leaks <br /> -Please be aware that the facility cannot operate the UST system prior to the EHD <br /> inspection and approval. <br />