Laserfiche WebLink
2 <br />From: Rakhi Chavvla[maiKo <br />Sent: Wednesday, April 09, 2014 12:39 PIVI <br />To: Garrett Backus [EA] <br />Subject: Re: Auburn 7700 Inc <br />The power panel and veederroot are wothe same wall and Iwill nonfinm with mycontractor tofind out if there <br />is any downtime for electrical. If there is any newill substitute power through generator <br />On Wed, Apr 9, 2014 at 11: 05 AM, Garrett Backus [EH] <ghackus@ J cehd.com> wrote: <br />Will the Veeder Root TLS -350 monitoring panel be moved during the construction? Are you leaving the specific vvaU <br />where the panel binstalled? How will power bemaintained during the remodel ? Usually the power will need tobe <br />turned off for aperiod oftime during the construction process. |fthis isthe case then how will power bemaintained to <br />the VeederRoot monitoring panel? If power cannot be maintained to the Veeder Root at all times then the facility is in <br />Thank you, <br />Garrett Backus <br />Lead Senior Registered Environmental Health Specialist, CUPA Programs <br />San Joaquin County Environmental Health Department <br />1858EHazelton Ave, Stockton, CA952O5 <br />Phone: (209) 468-2986 <br />Fax: (209) 468-3433 <br />Email: <br />2 <br />