Laserfiche WebLink
To: Garrett Backus [EH] 0 <br />Subject: Re: Auburn 7700 Inc <br />The power panel and veeder root are on the same wall and I will confirm with my contractor to find out if there <br />is any downtime for electrical. If there is any we will substitute power through generator <br />On Wed, Apr 9, 2014 at 11:05 AM, Garrett Backus [EH] <gbackus &scehd�.com> wrote: <br />Will the Veeder Root TLS -350 monitoring panel be moved during the construction? Are you leaving the specific wall <br />where the panel is installed? How will power be maintained during the remodel ? Usually the power will need to be <br />turned off for a period of time during the construction process. If this is the case then how will power be maintained to <br />the Veeder Root monitoring panel? If power cannot be maintained to the Veeder Root at all times then the facility is in <br />violation. <br />UE= <br />Garrett Backus <br />Lead Senior Registered Environmental Health Specialist, CUPA Programs <br />Fax: (209) 468-3433 <br />Email: gbackus@sicehd.com <br />From: Auburn 7700 [mailto:auburn7700@gmail.com] <br />Sent: Wednesday, April 09, 2014 10:55 AM <br />To: Garrett Backus [EH] <br />Subject: Re: Auburn 7700 Inc <br />My name is Rakhi Chawla and I am the Secratary Auburn 7700 Inc <br />