Laserfiche WebLink
WF UNIFIED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54a <br /> K1.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 49D-54b <br /> ❑4.NO DISPENSERS 1199.OTHER(S i ): <br /> PANEL MANUFACTURER: y. ," 47W55 MODEL#: jL 5�' 490-56. <br /> LEAK SENSOR MANUFACTURERS 490'57 = MODEL#(S): 490-58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS a.YES ❑b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN �Pl a.YES ❑b.NO 490-60 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. [3 a.YES ❑b.NO 49"1 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER Q a.YES ❑b.NO 490.62 <br /> 2.UDC CONSTRUCTION IS P1.SINGLE-WALLED ❑2.DOUBLE-WALLED 490.63 <br /> IF DOUBLE WALLED: 490.64a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: 1.LIQUID 2.PRESSURE 3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS 13a.YES ❑b.NO 490.646 <br /> VII.PERIODIC SYSTEM TESTING <br /> 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED ago 6s. <br /> LEAK-2LUZjg_%LE_1jDj MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2644.1 <br /> :ff2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490.66 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 49x67 <br /> VIII.RECORDKEEPING <br /> [Th following monitoring/maintenance records are kept for this facility: <br /> Alarm logs 490.68a ❑Visual Inspection Records 49"8b ❑Tank integrity testing results 490.6ac <br /> ❑SIR testing results(and supporting documentation records). 490-68d ❑ Tank gauging results(and supporting documentation records). 490-68e <br /> ❑ATG Testing results(and supporting documentation records).4go.68f ❑ Corrosion Protection 60-day logs 4go-68g <br /> ❑Equipment maintenance and calibration records. 490.68h <br /> IIX.TRAINING <br /> ❑Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 49"ga <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> 5k THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)49m9b <br /> .CPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)49o.69c <br /> ALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 4go-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.69e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"4go-69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490.698 <br /> ❑ OTHER(Specify):M69h,M6gi <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> • The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.490.7o <br /> X. COM[MENTSIADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.4go-71 <br /> M.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME 4go-72 TITLE 490-73 <br /> NAME 480-74 TITLE 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNERIOPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the,information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT 490.76 DATE: 490-77 <br /> 3.AWhofized Rmnimtolive <br /> APPLICANT NAME(print): 490.78 APPLICANT TITLE: 490-79 <br /> UPCF UST-D(12/2007)314 <br />