Laserfiche WebLink
.................... <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN -PAGE I (One form per facility) <br /> TYPE OF OF A;CTIC N M"I.NEW PLAN 2.CHANGE OF INFORMATION <br /> Rol. <br /> I. FACILITY INFORMATION _f 11 1F ]_ TI <br /> FACILITY ID# (Agency Use Only) F I A0 0 0 1 06O <br /> l --T-- <br /> BUSINESS NAME(Same as FACILITY NAME) R02. <br /> QUIK STOP MARKET#76 <br /> BUSINESS SITE ADDRESS R03. CITY R04. <br /> 1030 SOUTH OLIVE AVENUE ISTOCKTON <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> > If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> > Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered,hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> > Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and scaled container.Waste material shall be disposed <br /> appropriately. <br /> > Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity,has been in contact with any <br /> hazardous material.If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> > We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system,is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY-ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete onlyifa licable <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RIO, R20, R30. <br /> R1 1. R21. R31. <br /> R12. R22. R32. <br /> R13, R23. P,33. <br /> R14. R24. R34. <br /> R15. R25. R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME R,40. TITLE E0_ <br /> Mike Karvelot Director of Environmental Affairs <br /> NAME R41. TITLE <br /> Debbie Markovich Director of Petroleum Operations <br /> NAME R42. TITLE <br /> Chris Wright. Director of Construction&Maintenance <br /> NAME P-43. TITLE R53. <br /> Sam!Alkousa District Advisor <br /> V. MONITORING INDICATORS <br /> [F,MONITORING INDICATES A POSSIBLE UNA.MORIZED RELEASE,STEPS-g)VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: R60. <br /> ff'Additional system testing or data collection Whispection by qualified persons N'Recalibrationofequipmetit <br /> Other: <br /> Follow the steps as outlined in the accompanying "Simplified Response Plan for the Removal of an <br /> Unauthorized Release From the Interstitial Space of Double-Containment UST Systems". <br /> UST Response Plan(312008)-1/3 <br />