Laserfiche WebLink
r <br /> Fatinah Zareef [EH] <br /> From: Batra, Roger <roger.batra@quikstop.com> <br /> Sent: Tuesday,July 19, 2016 4:20 PM <br /> To: Fatinah Zareef[EH] <br /> Cc: Markovich, Debbie;Alkoussa, Sam; Bosano, Cesar; Baranbo, Sam; Riggs, Nancy;Veronica <br /> Freitas <br /> Subject: QS#76 UST Program Inspection Report(1030 S.Olive Avenue, Stockton, CA 95215) <br /> Attachments: QS#76 RTC Certification .pdf <br /> Fatinah, <br /> In response to your inspection report dated July 7,2016,the following actions were/are being taken: <br /> Item 103: The financial responsibility documents were uploaded to CERS in May 2016.The Storage Tank Certificate of <br /> Insurance to Demonstrate Financial responsibility(attached) and the policy period is from May 1, 2016 through May 1, <br /> 2017. 1 have also attached page 3.3 of CCR,Title 23, Division 3, Chapter 18, Petroleum Underground Storage Tank <br /> Cleanup Fund (effective November 27, 2000)for clarification. <br /> Item 209: Walton Engineering(Designated Operator) has been instructed to complete the designated employee training <br /> for Harpal Harit.The documentation of the training will be included in Tab 3 of the Blue UST Volume 1 Binder at the <br /> store. <br /> Item 309: Corrected at the time of inspection. <br /> Item 315: Corrected at the time of inspection. <br /> Item 318: Corrected at the time of inspection. <br /> The Return to Compliance Certification is signed and dated (see attached). Please call or email if you have any questions <br /> or need additional information. <br /> Thanks, <br /> Roger Batra <br /> Director of Environmental Affairs <br /> Quik Stop Markets, Inc. <br /> 4567 Enterprise Street <br /> Fremont, CA 94538 <br /> 510-445-2285 <br /> 1 <br />