Laserfiche WebLink
;9) E. Main St. <br />v <br />oke w' <br />• Furnish and install a new Veeder-Root BIR Protocol DIM <br />module <br />• Perform a "cold start' of the Monitoring System, including <br />the ISD mapping and turning over the sensors to create a <br />history. <br />• Perform a formal Monitoring System Certification with a <br />report to the local CUPA. <br />J <br />O 0 O • V <br />• � O <br />c N CD <br />03 <br />Legend <br />O Gasoline - 87 <br />• Gasoline - 89 <br />• Gasoline - 91 <br />Q Diesel <br />• Vapor <br />O Annular <br />• Submersible Turbine Pump <br />Q TLM Probe <br />Monitoring System Panel <br />8 Emergency Shut -Off Switch <br />Q Overfill Alarm <br />g Float 8 Chain <br />O Sump/UDC Sensor <br />Interstitial Sensor <br />Vacuum Sensor <br />O Line Leak Detector <br />• ISD Flow Meter <br />0 ISD Pressure Sensor <br />00 Spill Containment Kit <br />m <br />o <br />2 s <br />s Qo <br />.y <br />- <br />Df v <br />m <br />N <br />_ <br />U) <br />Q <br />O <br />Z <br />C N <br />� a <br />DO <br />(0 <br />�� <br />--- <br />�• <br />c N <br />L <br />>Lo <br />U <br />Q <br />c <br />O <br />(6-2 <br />0 <br />CO O <br />I <br />M <br />