Laserfiche WebLink
SWRCB,January 2002 Page of <br /> ti <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer x Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum x Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Incon st tst Equipment Resolution:.002" <br /> MENNEENERM <br /> somm— Spill Box#1 Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: 12" <br /> Bucket Depth: 12" <br /> Wait time between applying <br /> pressure/vacuum/water and 30 min <br /> starting test: <br /> Test Start Time: 2:05 2:21 <br /> Initial Reading(Rj): 3.5824" 3.5824" <br /> Test End Time: 2:20 2:36 <br /> Final Reading(RF): 3.5822" 3.5832" <br /> Test Duration: 15 min 2 x <br /> Change in Reading(RF-R,): .0002" .0008" <br /> Pass/Fail Threshold or .002" <br /> Criteria: <br /> TestAesult, x Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />