Laserfiche WebLink
Software Version Installed: — <br /> Complete the following cliec ist: <br /> Gail Yes ❑ No* Is the audible alarm o erational? <br /> Yes ❑ No* Is the visual alarm operational? <br /> Yes ❑ No* Were all sensors visuals inspected,functionally tested,and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> LQ N/A operational? <br /> Yes ElNo* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) W Sumpffrench Sensors; 9 Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? Yes; L3No. <br /> L3Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> el N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill int(s)and operating ro rl ? If so,at what percent of tank capacity does the alarm trigger? % <br /> ❑ Yes* k3 No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* R1 No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)❑ <br /> Product; ❑Water. If yes,describe causes in Section E,below. <br /> Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes ❑ No* Is all monitorin e <br /> AuiRmento rational Per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 03/01 <br />