My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2300 - Underground Storage Tank Program
>
PR0231732
>
COMPLIANCE INFO_1999-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 4:09:15 PM
Creation date
6/3/2020 9:51:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2010
RECORD_ID
PR0231732
PE
2361
FACILITY_ID
FA0003648
FACILITY_NAME
STKN ARMY AVIATION SUPP FACILITY*
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
01
SITE_LOCATION
2000 STIMSON RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231732_2000 STIMSON_1999-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE I <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Mol. <br /> PLAN TYPE ❑ MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. Moz. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) - <br /> FACILITY NAME STOC_l<'T'O Q t_kS t Moa. <br /> FACILITY SITE ADDRESS Zoo(:) S---r-1 r^s C)t--) R M04' I CITY Mos. <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in M06. <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHERfY)S eci : M07. <br /> ( P <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan ma ,etc.)which shows all required information,include it with this 21an. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) MIO' <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: ZL a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM MI I. <br /> PANEL MANUFACTURER: Caw ASO STt\C JV- M12. MODEL#: ST%K M13. <br /> LEAK SENSOR MANUFACTURER: E 4ZL M14' MODEL#(S): UST - i S MIs. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: M16. MODEL#: MIT <br /> IN-TANK PROBE MANUFACTURER: MIB. MODEL#(S): M19. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M20. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M21. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): M22. M23. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 9b.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): M26. M27. <br /> 6.VISUAL MONITORING DONE: a.DAILY ❑ b.WEEKLY(Requires agency approval) <br /> ❑ <br /> 99.OTHER(Specify): Meg. <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Mao. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: g a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M31. <br /> PANEL MANUFACTURER: et3 _) M32. MODEL#: A U-To 5S oc 'i 2 M33' <br /> LEAK SENSOR MANUFACTURER: E 3U_j M34. MODEL#(S): _ 11ST 1 s - M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? K a.YES ❑ b.NO M36. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? a a.YES ❑ b.NO M37. <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s): Mag. MODEL#(S): M39. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: Mao. MODEL#: M41. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M43. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M44. <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45. M46. <br /> ❑ S.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY' ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED" M47. <br /> "Requires agency approval **Allowed for monitoring of unburied emergency generator fuel piping only per HSC§25281.5(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(x)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) M48. <br /> SJCEHD-d(07/03)-I/4 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.