Laserfiche WebLink
F. Zn-Tank Gauging b/SIR Equipment: ZCh,,k this box if tank-�-au�ei a�is used only for inventorycontrol. <br /> ❑ Check this box if no tank eauains or SLR equipment is installed. <br /> This section must be completed if in tank gauging equipment is used to perform leak:detection monitoring. <br /> Complete the following checklist_ <br /> ❑ Yes . ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* "Mere all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system prodact level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *in the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Defector's(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the followin_gchecl list <br /> ❑ Yes ❑ No* For equipment start-up or annual .equipment certification, was a leak.simulated to verify LLD performance? <br /> ❑ NIA .(Check all-that apply) Simulated leak rate: ❑3 g.p.h.; ❑0.1 g.p.h 0 0.2 g.p_h_ <br /> ❑ Yes ® No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No* . Was the testing apparatus properly calibrated? <br /> -❑ Yes. ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects-a leak? <br /> G <br /> IN/'A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ® N/A <br /> ❑ Yes ❑ No* For electronic LILDs,does the turbine automatically shut off if any portion of the monitoring system,is disabled <br /> ® N/A or-disconnected? . <br /> C1 Yes ❑: No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ N/A or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> Q Yes ❑ No*. Were all items on the equipment manufacturer's maintenance checklist completed? <br /> ' In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> II. comrrtent:s: <br /> _ 1 <br /> i <br /> ' s <br /> - <br /> i <br /> i <br /> A <br /> Page 3 of 3 <br /> 03t01 <br /> i <br /> i <br /> i <br /> _. ------ ------.........._..__.._- --- --..-----...___... --------.._._------ --- ---- - -- -------- - .___.._.._.... --- -- ----- 1 <br /> 6 'd 2b6919*-602 oui sjogoejjuoO ni aat13 d6T = T0 90 6a 400 <br />