Laserfiche WebLink
11 <br />WOTORING SYSTEM CERTI CATION <br />For Use By All Jurisdictions Within the State of efornia <br />Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3, Title 23, California Code of Regulations <br />This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be prepared <br />for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank <br />system owner/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems within 30 <br />days of test date. <br />A. General Information <br />Facility Name: STC3CKT6VJ AS, <br />Bldg. No.: <br />Site Address: 2000 C; --i- l eASC 'j 'R City: S-t-tsCx-i-o k Zip:'SLC�Cc' <br />Facility Contact Person: 5c 'C'T(ki ' 'i3t CA Contact Phone No.: <br />3 � <br />Make/Model of Monitoring System: E &Y-) AUAD -S-T. i K .3 Date of Testing/Servicing: <br />B. Inventory of Equipment Tested/Certified <br />Check the appropriate boxes to indicate specific equipment inspected/serviced: <br />Tank ID: 'i r s!'_I a lC <br />Tank ID: T aJ lc- Z- 2 r t( <br />CdIn-TankGauging Probe. <br />Model: TS,P -lL% <br />( In -Tank Gauging Probe. Model: 'TS - EEL <br />I. Annular Space or Vault Sensor. <br />Model: TS? -0k <br />O_Annular Space or Vault Sensor. Model: s 5 - U <br />ai Piping Sump / Trench Sensor(s). <br />Model: _ j S? - 11t.S <br />❑ Piping Sump / Trench Sensor(s). Model: <br />❑ Fill Sump Sensor(s). <br />Model: <br />❑ Fill Sump Sensor(s). Model: <br />❑ Mechanical Line Leak Detector. <br />Model: <br />O Mechanical Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. Model: <br />❑ Tank Overfill / High -Level Sensor. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. Model: <br />❑ Other (specibLSqqipment.type and model in Section E on P e 2). <br />0 Other (s if Equipment t)r and model in Section E on <br />Tank ID• <br />Tank ID: <br />❑ In -Tank Gauging Probe. <br />Model: <br />❑ In -Tank Gauging Probe. Model: <br />❑ Annular Space or Vault Sensor. <br />Model: <br />❑ Annular Space or Vault Sensor. Model: <br />O Piping Sump / Trench Sensor(s). <br />Model: <br />❑ Piping Sump / Trench Sensor(s). Model: <br />❑ Fill Sump Sensor(s). <br />Model: <br />❑ Fill Sump Sensor(s). Model: <br />❑ Mechanical Line Leak Detector. <br />Model: <br />❑ Mechanical Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. <br />Model: <br />❑ Electronic Line Leak Detector. Model: <br />❑ Tank Overfill / High -Levet Sensor. <br />Model: <br />❑ Tank Overfill / High -Level Sensor. Model: <br />❑ Other �sBEER Squi2T22LtM and model in Section E on P e 2). <br />❑ Other (s if 29uipMSRL!Loe and model in Section Eon <br />Dispenser ID:'TP AOS, UDC_ <br />Dispenser ID: RCCL Ubc..- <br />WDispenser Containment. Sensor(s). <br />Model: <br />0 Dispenser Containment Sensor(s). Model: <br />❑ Shear Valve(s). <br />❑ Shear Valve(s). <br />O Dispenser Containment Float(s) and Chain(s). <br />❑Dis user Containment Float(s) and Chain(s). <br />Dispenser ID: <br />Dispenser ID: <br />❑ Dispenser Containment Sensor(s). <br />Model: <br />❑ Dispenser Containment Sensor(s). Model: <br />❑ Shear Valve(s). <br />❑ Shear Valve(s). <br />❑ Dispenser Containment Float(s) and Chain s). <br />❑ Dispenser Containment Floats and Chain(s). <br />Dispenser ID: <br />Dispenser ID: <br />O Dispenser Containment Sensor(s). <br />Model: <br />0 Dispenser Containment Sensor(s). Model: <br />❑ Shear Valve(s). <br />O Shear Valve(s). <br />L3Di!penser Containment FloatKg and Chain(s). <br />0 Dispenser Containment Float(s) and Chain(s). <br />*If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility <br />C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers' <br />guidelines. Attached to this Certification is information (e.g. manufacturers'checklists) necessary to verify that this information is <br />correct and a Plot Plan showing the layout of monitoring equipment. For any eqMp7pabijof generating such reports, I have also <br />attached a copy of the rert; (check all that apply): IR System set-up report <br />Technician Name (print): CC --W Gpi— ioDu Signature: <br />Certification No.: O Li i' C>0 -1r. I t License. No.: <br />Testing Company Name:`rAi.,ii -1 +0C Phone NoA BOS ) L -S 6 " W6 <br />Site Address: Z 7 y J 5AzeuLlo &v, 46 \(6 kAU q;A + e- c'900-3 Date of Testing/Servicing: 8 / tt ok- <br />Page 1 of 3 03/01 <br />Monitoring System Certification <br />